|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbidity at Mid-Flood Tide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This Drawing has been prepared for the use of AECOM's client.
It may not be used, modified, reproduced or relied upon by third parties,
except as agreed by AECOM or as required by law. AECOM accepts no
responsibility, and denies any liability whatsover, to any party that uses or
relies on this drawing without AECOM's express written consent. |
HONG
KONG - ZHUHAI - MACAO BRIDGE |
|
|
|
HONG
KONG BOUNDARY CORSSING FACILITIES |
|
|
-
RECLAMATION WORKS |
|
Graphical
Presentation of Impact Water Quality Monitoring Results |
|
|
|
Project
No.: 60249820 |
Date: July 2012 |
|
Appendix J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|