Appendix N

Cumulative Statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Cumulative statistics on Exceedances

 

Total no. recorded in this month

Total no. recorded since project commencement 

1-Hour TSP

Action

-

-

Limit

-

-

24-Hour TSP

Action

-

-

Limit

-

-

Noise

Action

-

-

Limit

-

-

Water Quality

Action

-

1

Limit

-

1

Dolphin Monitoring

Action

-

-

Limit

-

-

Remarks: Exceedances which are not project-related are not presented in this table.

 

Cumulative statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Date Received

Subject

Status

Total no. received in this month

Total no. received since project commencement 

Environmental complaints

06 Jan 14

As informed by the Contractor on 27 Dec 13. A complaint involves barges loaded with sand material without properly covered was blown to the inside of the residential area of Tuen Mun Pierhead Garden which caused disturbance to residence. With refer to available information provided, it cannot indicate that the water quality impact and air quality impact were caused by the vessel of this Contract and therefore the complaint could not be concluded as related to this Contract.

 

Closed

1

14

21 Jan 14

EPD referred a complaint from complainant who advised that blackish mud was found along the edge of the construction site of Hong Kong-Zhuhai-Macao Bridge Hong Kong Project near the airport in the morning of 18 January 2014. Therefore in accordance with the investigation results, the complaint is considered as not related to contract HY/2010/02.

Closed

2

15

Notification of summons

-

-

-

-

1

Successful Prosecutions

 

 

 

 

1