Appendix N

Cumulative Statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Cumulative statistics on Exceedances

 

 

Total no. recorded in this month

Total no. recorded since project commencement 

1-Hour TSP

Action

-

-

Limit

-

-

24-Hour TSP

Action

-

-

Limit

-

-

Noise

Action

-

-

Limit

-

-

Water Quality

Action

1

2

Limit

2

3

Dolphin Monitoring

Action

-

-

Limit

-

-

Remarks: Exceedances which are not project-related are not presented in this table.

 

Cumulative statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Date Received

Subject

Status

Total no. received in this month

Total no. received since project commencement 

Environmental complaints

14 October 2014

As informed by the Contractor yesterday, 14 October 2014, a follow up air quality complaint has been received by this Contract (same case to environmental complaint reported in the last reporting month). The complainant complained that about 20-30 sand barges always moor at the sea area opposite to tower 4 of Melody Garden and Richland Garden.  This problem has affected the air quality.  After investigation, there is no adequate information to conclude the observed impact is related to this Contract.

 

Closed

1

26A

 

30 September 2014

With reference to RSS’s letter ref.: 211036/(HY2010/02)/M05/432/B07605 dated on 30 September 2014 pertaining the performance on barges operations at the sea area off the Tuen Mun Ferry Pier. A complaint concerning leakage of sand filling material from vessels at sea area off Tuen Mun Ferry Pier was first received by EPD from Tuen Mun District Council (TM DC) on 19 September 2014 and it was subsequently referred by EPD to the Highways Department to handle on 23 September 2014 through EPD’s memo ref.: EP/RW/0000362128. Referring to EPD's Memo, it is also noted that some local residents at Tuen Mun expressed their concern that the stockpile of dusty sand material on the barges should be covered with impervious sheeting to avoid causing fugitive dust emissions of sand and dust.  Subsequently, TM DC followed up their complaint with Highways Department on 17 October 2014. The follow up complaint concerning water quality impact at sea area off Tuen Mun area was referred to the project team to response on 17 October 2014. After investigation, there is no adequate information to conclude the observed impact is related to this Contract.

 

Closed

2

27

Notification of summons

-

-

-

-

2

Successful Prosecutions

-

-

-

-

2