Appendix N
Cumulative Statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
Cumulative statistics on Exceedances
|
Total
no. recorded in this month
|
Total
no. recorded since project commencement
|
|
1-Hour
TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
24-Hour
TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Noise
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Water
Quality
|
Action
|
1
|
2
|
Limit
|
2
|
3
|
|
Dolphin
Monitoring
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
Remarks: Exceedances
which are not project-related are not presented in this table.
Cumulative statistics on Exceedances, Complaints,
Notifications of Summons and Successful Prosecutions
|
Date Received
|
Subject
|
Status
|
Total no. received
in this month
|
Total no. received since
project commencement
|
Environmental
complaints
|
14 October 2014 |
As
informed by the Contractor yesterday, 14 October 2014, a follow up air
quality complaint has been received by this Contract (same case to
environmental complaint reported in the last reporting month). The
complainant complained that about 20-30 sand barges always moor at the sea
area opposite to tower 4 of Melody Garden and Richland Garden. This
problem has affected the air quality.
After investigation, there is no adequate information to conclude the
observed impact is related to this Contract.
|
Closed
|
1
|
26A
|
|
30 September 2014 |
With
reference to RSS’s letter ref.: 211036/(HY2010/02)/M05/432/B07605
dated on 30 September 2014 pertaining the performance on barges operations at
the sea area off the Tuen Mun Ferry Pier. A complaint concerning leakage of
sand filling material from vessels at sea area off Tuen Mun Ferry Pier was
first received by EPD from Tuen Mun District Council (TM DC) on 19 September
2014 and it was subsequently referred by EPD to the Highways Department to
handle on 23 September 2014 through EPD’s memo ref.: EP/RW/0000362128. Referring
to EPD's Memo, it is also noted that some local residents at Tuen Mun
expressed their concern that the stockpile of dusty sand material on the
barges should be covered with impervious sheeting to avoid causing fugitive
dust emissions of sand and dust.
Subsequently, TM DC followed up their complaint with Highways
Department on 17 October 2014. The follow up complaint concerning water
quality impact at sea area off Tuen Mun area was referred to the project team
to response on 17 October 2014. After investigation, there is no adequate
information to conclude the observed impact is related to this Contract.
|
Closed
|
2
|
27
|
Notification of
summons
|
-
|
-
|
-
|
-
|
2
|
Successful
Prosecutions
|
-
|
-
|
-
|
-
|
2
|