Appendix J
Cumulative Statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
Cumulative statistics on Exceedances
|
Total
no. recorded in this month
|
Total
no. recorded since project commencement
|
|
1-Hour
TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
24-Hour
TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Noise
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Water
Quality
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
Remarks: Exceedances
which are not project-related are not presented in this table.
Cumulative statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
|
Date Received
|
Subject
|
Status
|
Total no. received
in this quarter
|
Total no. received since
project commencement
|
Environmental
complaints
|
04
March13
|
One
(1) complaint was referred by EPD to ET regarding the construction noise
impact from cranes operating from the barges for the Hong Kong ¡VZhuhai-Macao
Bridge Hong Kong Project generating squeak noise in the evening of 1 Mar 2013
causing annoyance to him/her. The investigation results show that the
complaint was non-project related. |
Closed
|
4
|
5
|
|
08
April13
|
One
(1) complaint was referred by EPD regarding oil dumping observed from various
vessels operating for HZMB HK projects near Tung Chung Development Pier over
the past few months. The investigation results showed that the complaint was
non-project related.
|
Closed
|
4
|
6
|
|
10
May 2013
|
A
complaint referred to the Contractor by EPD on 10 May 2013 regarding the
scattered debris of silt curtain noted at Sha Lou Wan and Tung Chung Bay.
Immediate inspection and clean up action was taken by the Contractor.
|
Closed
|
4
|
7
|
|
23
May 2013
|
A
follow-up complaint referred by EPD was received on 23 May 2013 regarding the
oil stain noted near Tung Chung Development Pier for past few months.
|
Closed
|
4
|
8
|
Notification of
summons
|
29
April13
|
As
informed by the Contractor on 9 May 13, one summons was received on 29 April
13 regarding the suspected violation case of Noise Control Ordinance
(Cap.400) at Works Area WA4 on 31 Oct 2012.
|
-
|
1
|
1
|
Successful
Prosecutions
|
-
|
-
|
-
|
0
|
0
|