Appendix J
Cumulative Statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
Cumulative statistics on Exceedances
|
Total no. recorded
in this month
|
Total no. recorded
since project commencement
|
|
1-Hour TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
24-Hour TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Noise
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Water Quality
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Dolphin Monitoring
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
Remarks: Exceedances
which are not project-related are not presented in this table.
Cumulative statistics on Exceedances, Complaints,
Notifications of Summons and Successful Prosecutions
|
Date Received
|
Subject
|
Status
|
Total no. received
in this quarter
|
Total no. received since
project commencement
|
Environmental
complaints
|
26 Sept 13
|
One (1) complaint
was logged by the Contractor regarding the leakage from work barges causing
water pollution near Tuen Mun Richland Garden received on 26 Sept 13. With
refer to the available information such as photo record of the incident cannot
indicate that the leakage from work barges was caused by the vessel of this
Contract and the complaint could not be concluded as project related.
|
Closed
|
1
|
9
|
1 Nov 13
|
As informed by the
Contractor on 5 Nov 13, a noise complaint received on 14 Sept 13 was referred
to the Contractor of HKBCF on 1 Nov 13. The captioned complaint involves
noise generated by a tug boat operating near a pier at Tung Chung around
05:55am-06:45am on 14 Sept 13. After investigation, the complaint is
considered not likely to be related to the construction works.
|
Closed
|
2
|
10
|
|
11 Nov 13
|
As informed by the
Contractor, complaint received from Penta-Ocean – Gitanes Joint Venture
(CV/2012/03) mentioned that the formation works of the Contaminated Mud Pit
CMP1 to the South of the Brothers (CMP1 of SB) which has been completed in
mid-August 2013 and the pit has been commissioned for receiving contaminated
marine mud from other projects starting from 16 August 2013. However, it was
recently observed that some of the project vessels of HY/2010/02 had berthed
within the said pit and those anchorages would likely cause disruption to the
underlying contaminated mud and thus induce unfavourable contamination impact
to the surrounding marine environment. In this regard, they reminded the
contractor to avoid berthing of their vessels within the boundary of CMP1 of
SB thereafter for the sake of environmental concern. After investigation, the
complaint is considered not likely to be related to the construction works.
|
Closed
|
3
|
11
|
|
Notification of
summons
|
-
|
-
|
-
|
-
|
1
|
Successful
Prosecutions
|
-
|
-
|
-
|
-
|
-
|