Appendix
J
Cumulative
Statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
Cumulative
statistics on Exceedances
|
Total no. recorded
in this month
|
Total no. recorded
since project commencement
|
|
1-Hour TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
24-Hour TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Noise
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Water Quality
|
Action
|
2
|
2
|
Limit
|
-
|
-
|
|
Dolphin Monitoring
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
Remarks: Exceedances
which are not project-related are not presented in this table.
Cumulative
statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
|
Date Received
|
Subject
|
Status
|
Total no. received in this quarter
|
Total no. received since project
commencement
|
Environmental complaints
|
5 Dec13
|
As informed by the Contractor on 5 Dec 13, one
complaint was noted on 12 Nov regarding a barge moving through the southern
channel. After investigation, the noise complaint was considered as
non-project related. |
Closed
|
1
|
12
|
12 Dec13
|
As informed by the Contractor on
12 Dec 13. A complaint involves the leakage of sand from barges causing water
discoloration at sea near Tuen Mun
Pierhead Garden and sand material without properly
covered was blown to the inside of the residential area which caused
disturbance to residence. With refer to available information provided and
monitoring data recorded on 09 Dec 13, it cannot indicate that the water
quality impact and air quality impact were caused by the vessel of this
Contract and therefore the complaint could not be concluded as related to
this Contract
|
Closed
|
2
|
13
|
|
6 Jan 14
|
As informed by the Contractor on 6 Jan, A
complaint involves barges loaded with sand material without properly covered
was blown to the inside of the residential area of Tuen
Mun Pierhead Garden which
caused disturbance to residence was received on 27 Dec 13. With refer to
available information provided, it cannot indicate that the water quality
impact and air quality impact were caused by the vessel of this Contract and therefore
the complaint could not be concluded as related to this Contract. |
Closed
|
3
|
14
|
|
|
21 Jan 14
|
EPD referred a complaint from complainant who
advised that blackish mud was found along the edge of the construction site
of Hong Kong-Zhuhai-Macao Bridge Hong Kong Project
near the airport in the morning of 18 January 2014. After receipt of the
complaint, site daily was reviewed and follow-up investigation has been
conducted and excavation and dredging activities were not observed within the
site boundary of HKBCF during the joint site inspection audit. Therefore in
accordance with the investigation results, the complaint is considered as not
related to contract HY/2010/02 |
Closed
|
1
|
15
|
Notification of summons
|
-
|
-
|
|
-
|
1
|
Successful
Prosecutions
|
-
|
-
|
-
|
-
|
1
|