Appendix J
Cumulative Statistics on Exceedances,
Complaints, Notifications of Summons and Successful Prosecutions
Cumulative statistics on Exceedances
|
Total
no. recorded in this reporting quarter
|
Total
no. recorded since project commencement
|
|
1-Hour TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
24-Hour
TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Noise
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Water
Quality
|
Action
|
-
|
1
|
Limit
|
-
|
1
|
|
Dolphin
Monitoring
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
Remarks: Exceedances which are not
project-related are not presented in this table.
Cumulative statistics on Exceedances,
Complaints, Notifications of Summons and Successful Prosecutions
|
Date Received
|
Subject
|
Status
|
Total no. received
in this quarter
|
Total no. received since
project commencement
|
Environmental
complaints
|
17
March 2014
|
EPD referred a
complaint on 17 March 2014 from complainant who advised that there was sea
water coloured in blue observed in vicinity of Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary
Facilities (HKBCF) where stone column installation was taking place. The
complainant suspected that the filling material was stained and contaminated
the sea water after being filled into the sea. With reference to the
available information, it is indicated that the abovementioned sea water coloured in blue observed in vicinity of HKBCF is
unlikely to be project related. |
Closed
|
1
|
16
|
|
22
March 2014
|
EPD referred a
complaint from a complainant who advised that muddy water was found being
discharged from the construction site of Hong Kong-Zhuhai-Macau
Bridge Hong Kong Boundary Crossing Facilities (HKBCF) – Reclamation Works on
22 March 2014. After investigation, it is considered that the complaint is
unlikely to be project related. |
Closed
|
2
|
17
|
|
25
March 2014
|
As informed by the Contractor, a complaint
was received by the Contractor on 25 March 14 concerning sand and dust
emission from uncovered barges parking at the sea area off the Tuen Mun Ferry Pier. With refer to the available
information; it is unable to conclude whether the complaint is
project related. |
Closed
|
3
|
18
|
|
7
May 14
|
As informed by the
Contractor on 7 May 14, a complaint was received by the Contractor on 17
April 14 concerning sand and dust emission from uncovered barges parking at
the sea area off the Tuen Mun
Ferry Pier. Investigation result shows that the complaint is unlikely to be
related to this Contract.
|
Closed
|
4
|
19
|
|
30 May 14
|
As informed by the Contractor
on 30 May 14, an environmental complaint had been received on 28 May 2014.
The complainant mentioned that waste such as earth and concrete were being felled
into the sea everyday at the Hong Kong-Zhuhai-Macao
Bridge at location where construction works are being conducted, causing
pollution to the marine environment. After investigation, it is concluded
that the complaint is unlikely to be related to this Contract.
|
Closed
|
5
|
20
|
Notification of
summons
|
-
|
-
|
-
|
-
|
2
|
Successful
Prosecutions
|
28 April 2014
|
In relation to
the notification of summons received March 2014 due to works carried out on 6
October 13 contrary to conditions of NCO, Cap.400. The Contractor pledged guilty to the charge during
the court appearance on 28 April 2014. |
-
|
1
|
2
|