Appendix J

Cumulative Statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Cumulative statistics on Exceedances

 

 

Total no. recorded in this reporting quarter

Total no. recorded since project commencement 

1-Hour TSP

Action

-

-

Limit

-

-

24-Hour TSP

Action

-

-

Limit

-

-

Noise

Action

-

-

Limit

-

-

Water Quality

Action

-

1

Limit

-

1

Dolphin Monitoring

Action

-

-

Limit

-

-

Remarks: Exceedances which are not project-related are not presented in this table.

 

Cumulative statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Date Received

Subject

Status

Total no. received in this quarter

Total no. received since project commencement 

Environmental complaints

17 March 2014

EPD referred a complaint on 17 March 2014 from complainant who advised that there was sea water coloured in blue observed in vicinity of Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Facilities (HKBCF) where stone column installation was taking place. The complainant suspected that the filling material was stained and contaminated the sea water after being filled into the sea. With reference to the available information, it is indicated that the abovementioned sea water coloured in blue observed in vicinity of HKBCF is unlikely to be project related.

 

Closed

1

16

 

22 March 2014

EPD referred a complaint from a complainant who advised that muddy water was found being discharged from the construction site of Hong Kong-Zhuhai-Macau Bridge Hong Kong Boundary Crossing Facilities (HKBCF) – Reclamation Works on 22 March 2014. After investigation, it is considered that the complaint is unlikely to be project related.

 

Closed

2

17

 

25 March 2014

As informed by the Contractor, a complaint was received by the Contractor on 25 March 14 concerning sand and dust emission from uncovered barges parking at the sea area off the Tuen Mun Ferry Pier. With refer to the available information; it is unable to conclude whether the complaint is project related.

Closed

3

18

 

7 May 14

As informed by the Contractor on 7 May 14, a complaint was received by the Contractor on 17 April 14 concerning sand and dust emission from uncovered barges parking at the sea area off the Tuen Mun Ferry Pier. Investigation result shows that the complaint is unlikely to be related to this Contract.

Closed

4

19

 

30 May 14

As informed by the Contractor on 30 May 14, an environmental complaint had been received on 28 May 2014. The complainant mentioned that waste such as earth and concrete were being felled into the sea everyday at the Hong Kong-Zhuhai-Macao Bridge at location where construction works are being conducted, causing pollution to the marine environment. After investigation, it is concluded that the complaint is unlikely to be related to this Contract.

Closed

5

20

Notification of summons

-

-

-

-

2

Successful Prosecutions

28 April 2014

In relation to the notification of summons received March 2014 due to works carried out on 6 October 13 contrary to conditions of NCO, Cap.400. The Contractor pledged guilty to the charge during the court appearance on 28 April 2014.

 

-

1

2