Page
TABLE OF
CONTENTS
1 |
|
1 |
1.1 |
Basic Project Information |
1 |
1.2 |
Project Organization |
2 |
1.3 |
Construction
Programme |
2 |
1.4 |
Construction
Works Undertaken During the Reporting Period |
2 |
|
|
|
|
|
|
2 2.0 |
|
3 |
2.1 |
Monitoring
Locations |
3 |
2.2 |
Monitoring
Requirements |
3 |
2.3 |
Monitoring
Results |
4 |
|
|
|
3 |
5 |
|
3.1 |
Monitoring
Locations |
5 |
3.2 |
Monitoring
Requirements |
5 |
3.3 |
Monitoring
Results |
5 |
|
|
|
|
|
|
4 |
6 |
|
4.1 4.2 |
Site Inspection Advice on the Solid and Liquid Waste Management
Status |
6 |
4.3 |
Environmental Licenses and Permits |
6 |
4.4 |
Implementation Status of Environmental Mitigation
Measures |
7 |
4.5 |
Summary of Exceedance of the Environmental
Quality Performance Limit |
7 |
4.6 |
Summary of Complaints, Notification of Summons
and Successful Prosecution |
7 |
|
|
|
5 |
8 |
|
5.1 |
Construction Programme for the Coming Months |
8 |
5.2 |
Environmental
Site Inspection Schedule for the Coming Month |
8 |
|
|
|
6 |
8 |
|
|
Conclusions |
8 |
|
||
Figure 2 |
Air Quality and Noise Monitoring Stations for
HKBCF |
|
|
|
|
APPENDICES |
|
|
Location of Works Areas |
||
Project Organization for Environmental Works |
||
Construction Programme |
||
Event and Action Plan |
||
Waste Flow Table |
||
Environmental Licenses and Permits |
||
Implementation Schedule for Environmental Mitigation Measures (EMIS) |
||
Statistics on Environmental Complaints, Notification of Summons and Successful Prosecutions |
||
Environmental
Site Inspection Schedule |
This Monthly Environmental
Monitoring and Audit (EM&A) Report is
prepared for Contract HY//2013/02 Hong Kong–Zhuhai-Macao Bridge Hong Kong
Boundary Crossing Facilities (HKBCF) – Infrastructure Works Stage I (Western
Portion) (hereafter referred to as “the Contract”) for the Highways Department
of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to
China Harbour Engineering Co., Ltd. (hereafter referred to as “the Contractor”)
and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the
Contractor.
The Contract is part of
ETS-Testconsult Limited has been
appointed by the Contractor to implement the Environmental Monitoring &
Audit (EM&A) programme for the Contract in accordance with the Updated
EM&A Manual for HKBCF (Version 1.0) and provide environmental team services
to the Contract.
This is the first Monthly Environmental
Monitoring and Audit (EM&A) Report for the Contract which summaries
findings of the EM&A works conducted during the reporting
period from 24 November 2014 to 31 December 2014.
Site Activities
As informed by the Contractor, site activities were
carried out in
this reporting month:
§
Pre-Drilling
Work at Main Site
§
Bored
Piles Works at Main Site
§
Storm
& Sewer Drain Works at Main Site; and
§
Trial
Pit at Portion I.
Environmental Monitoring and Audit Progress
The monthly EM&A programme was
undertaken in accordance with the Updated EM&A Manual for HKBCF (Version
1.0). It should be noted that the air quality and noise monitoring works for
the Contract are covered by Contract No. HY/2010/02 Hong
Kong-Zhuhai-
The date of site
inspection during the reporting period are listed below:
Environmental Site Inspection 25 November 2014, 02,09,19,23
and 30 December 2014
Breaches
of Action and Limit Levels
There was no Action and Limit Level exceedance
of 1-hr TSP level and 24-hr TSP level recorded
at station AMS6 by the Environmental Team of Contract No. HY/2011/03
during the reporting period.
There was no Action and Limit Level exceedance
of 1-hr TSP level and 24-hr TSP level
recorded at station AMS7 by the Environmental Team of Contract No. HY/2010/02 during the
reporting period.
There was no Action and Limit Level exceedance
for noise recorded at
station NMS2 and station NMS3B by the Environmental Team of Contract No. HY/2010/02 during the
reporting period.
Complaint Log
There was no
complaint received in relation to the environmental impact during the reporting period.
Notifications of Summons and Successful
Prosecutions
There were no
notifications of summons or prosecutions received during the reporting period.
Reporting Change
There was no reporting change in the reporting period.
Future
Key Issues
The future key
issues to be undertaken in the upcoming month are as follows:
§
Pre-Drilling
Work at Main Site;
§
Bored
Piles Works at Main Site;
§
Storm
& Sewer Drain Works at Main Site; and
§
Watermain
works at Portion I.
1.1 Basic Project Information
§
Construction of the
viaducts and roads at the western portion of Hong Kong Boundary Crossing Facilities
(HKBCF) mainly for connection with the Hong Kong – Zhuhai – Macao
Bridge (HZMB), Hong Kong Link Road (HKLR), Hong Kong International Airport
(HKIA) and the Tuen Mun-Chek Lap Kok Link (TM-CLKL);
§
Construction of the road modification at the
SkyCity Interchange at
§
Construction of associated street lighting,
street furniture, road marking, road signage, drainage, sewerage, fresh water
and flushing water supply, irrigation, landscape, electrical and mechanical
(E&M), utilities and services works;
§
Provisioning of civil engineering works and power
supply installation for the Traffic Control and Surveillance System TCSS);
§
Other works in accordance with the
Contract.
1.2 Project Organization
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name of Key Staff |
Tel. No. |
Fax No. |
Engineer or Engineer’s Representative (AECOM Asia
Co. Ltd.) |
Resident Engineer |
Mr. Fred Yeung |
63308293 |
31525116 |
Environmental Project Office / Independent Environmental Checker
(Environ Hong Kong Limited) |
Environmental Project Office Leader |
Mr. Y. H. Hui |
34652888 |
34652899 |
Independent Environmental Checker |
Mr. Raymond Dai |
34652888 |
34652899 |
|
Environmental
Site Supervisor |
Mr. Ray Yan |
51818165 |
34652899 |
|
Contractor (China Harbour Engineering
Co., Ltd.) |
Environmental Officer |
Mr. K. F. Wong |
93724383 |
39150300 |
Environmental Engineer |
Mr. Calvin So |
97246254 |
39150300 |
|
Environmental Supervisor |
Ms. Joy Chan |
54005086 |
39150300 |
|
Environmental Supervisor |
Ms. Selena Yang |
55122662 |
39150300 |
|
Environmental
Team (ETS-Testconsult Ltd.) |
Environmental
Team Leader |
Mr
C. L. Lau |
2946
7791 |
2695
3944 |
1.3 Construction Programme
1.4 Construction
Works Undertaken During the Reporting Period
A summary of the construction activities undertaken during this
reporting period is shown below:
§
Pre-Drilling
Work at Main Site;
§
Bored
Piles Works at Main Site;
§
Storm
& Sewer Drain Works at Main Site; and
§
Trail
pit at Portion I.
2.1 Monitoring Locations
Table 2.1 Air Quality Monitoring
Locations
Identification No. |
Location Description |
AMS6(1) |
Dragonair / CNAC (Group)
Buidling
|
AMS7(1) |
Hong Kong SkyCity Marriott Hotel |
Remarks:
(1) The ET of this Contract should conduct impact air quality
monitoring at the AMS listed in the table as part of EM&A programme according
to latest notification from ENPO when the monitoring station(s) is/are no
longer covered by another ET of the HZMB project.
2.2 Monitoring Requirements
Table 2.2
Action and
Limit Levels for 1-hour TSP
Monitoring Station. |
Action Level,mg/m3 |
Limit Level,mg/m3 |
AMS6 – Dragnair / SNAC (Group)
Building (HKIA) |
360 |
500 |
AMS7 – Hong Kong SkyCity
Marriott Hotel |
370 |
500 |
Table 2.3
Action and Limit Levels for 24-hour
TSP
Monitoring Station. |
Action Level,mg/m3 |
Limit Level,mg/m3 |
AMS6 – Dragnair / SNAC (Group)
Building (HKIA) |
173 |
260 |
AMS7 – Hong Kong SkyCity
Marriott Hotel |
183 |
260 |
2.3 Monitoring Results
3.1
Monitoring Locations
Table 3.1 Construction
Noise Monitoring Locations
Identification No. |
Location Description |
NMS2(1) |
|
NMS3B(1)
(2) |
Site Boundary of Site Office Area at
Works Area WA2 |
Remarks:
(1) The ET of this Contract should
conduct impact noise monitoring at the NMS listed in the table as part of
EM&A programme according to latest notification from ENPO when the
monitoring station(s) is/are no longer covered by another ET of the HZMB
project.
(2) The Action and Limit Levels for
schools will be applied for this alternative monitoring location.
3.2 Monitoring Requirements
Table 3.2
Action and Limit Levels for
Construction Noise
Parameter |
Action Level |
Limit Level |
07:00 – 19:00 hours on normal weekdays |
When one documented complaint
is received |
75 dB(A)* |
|
Notes :
If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the Noise Control Authority have to be followed.
* Reduce
to 70
dB(A) for schools and 65 dB(A) during school examination period.
3.3 Monitoring Results
4 ENVIRONMENTAL
SITE INSPECTION AND AUDIT
4.1 Site
Inspection
4.1.1 Site Inspections were carried out on a weekly basis to monitor the
implementation of proper environmental pollution control mitigation measures
for the project. During the reporting period,site
inspections were carried out on 25 November 2014, 02,09,19,23 and 30 December 2014.
4.1.2 Particular observations during
the site inspections are described below:
25 November 2014
(a)
No drip tray was provided for a chemical container at site near
Bridge 8. This observation was closed on 02 December 2014.
02 December 2014
(a)
An oil container was observed stored
inadequately. This observation was closed on 09 December 2014.
09 December 2014
(a)
No observation was made.
19 December 2014
(a) No bunding was provided for the untreated wastewater from
leaking out of site boundary during the ground investigation works. This
observation was closed on 23 December 2014.
23 December 2014
(a)
No observation was made.
30 December 2014
(a)
No observation was made.
4.2 Advice on the solid and Liquid Waste
Management Status
4.2.2 The
monthly summary of waste flow table is detailed in Appendix E.
4.2.3 The Contractor was reminded that chemical waste containers should be
properly treated and stored temporarily in designated chemical waste storage
area on site in accordance with the Code of Practice on the Packing, Labelling
and Storage of Chemical Waste.
4.3 Environmental Licenses and Permits
4.3.1 The valid environmental licenses and permits during the reporting period
are summarized in Appendix F.
4.4 Implementation Status of Environmental
Mitigation Measures
4.5 Summary of Exceedance of the
Environmental Quality Performance Limit
4.6 Summary of Complaints, Notification of
Summons and Successful Prosecution
5.1 Construction Programme for the Coming
Months
Table 5.1 Construction
Activities for January 2015
Site Area |
Description of Activities |
Main Site |
Pre-Drilling Work |
Main Site |
Bored Piles Works |
Main Site |
Storm & Sewer Drain Works |
Portion I |
Watermain Works |
5.2 Environmental Site Inspection Schedule
for the Coming Month
6 CONCLUSION.
6.1 Conclusions