1. INTRODUCTION
1.1 Basic Project Information
1.1.1
This Final Environmental Monitoring and Audit
(EM&A) Review Report is prepared for Contract No. HY/2013/03 ¡§Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities ¡V Vehicle
Clearance Plazas and Ancillary Buildings and Facilities¡¨ (includes the
construction works of Contract No. HY/2013/06 ¡§Hong Kong-Zhuhai-Macao Bridge
Hong Kong Boundary Crossing Facilities ¡V Automatic Vehicle Clearance Support
System¡¨ within Contract No. HY/2013/03 works area) (hereafter referred to as
¡§the Contract¡¨) for the Highways Department of Hong Kong Special Administrative
Region (HKSAR). The Contract was awarded to China Harbour Engineering Co.
Limited (construction works of Contract No. HY/2013/06 was awarded to ATAL
Technologies Limited within Contract No. HY/2013/03 works area) (hereafter
referred to as ¡§the Contractor¡¨) and MateriaLab
Consultants Limited (MCL) was appointed as the Environmental Team (ET) by the
Contractor.
1.1.2
Contract No. HY/2013/03 (includes the construction
works of Contract No. HY/2013/06 within Contract No. HY/2013/03 works area) is
part of the ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing
Facilities¡¨ (HZMB HKBCF) Project which is a ¡§Designated Project¡¨ under Schedule
2 of the Environmental Impact Assessment (EIA) Ordinance (Cap. 499) and for
which an EIA Report (Register No. AEIAR-145/2009) was prepared and approved.
The current Environmental Permit (EP) for HKBCF, namely No. EP-353/2009/K, was
issued on 11 April 2016. These documents are available through the EIA
Ordinance Register. Commencement of Contract No. HY/2013/03 took place on 10
April 2015 while the construction works and the EM&A programme of Contract
No. HY/2013/03 commenced on 29 August 2015 (commencement of Contract No.
HY/2013/06 took place on 14 August 2015 while the construction works and the
EM&A programme of Contract No. HY/2013/06 within Contract No. HY/2013/03
works area commenced on 13 September 2016). The works areas of the contract are
shown in Appendix A.
1.1.3
This is the Final EM&A
Review Report summarising the findings of EM&A activities conducted under
Contract No. HY/2013/03 from 29 August 2015 to 31 January 2019 (from 13 September
2016 to 31 January 2019 for the construction works of Contract No. HY/2013/06
within Contract No. HY/2013/03 works area) (the ¡§reporting period¡¨) and is
submitted to fulfil Condition 16.5 of the Updated EM&A Manual for HKBCF.
1.2
Project
Organisation
1.2.1
The organisation chart and lines of communication
with respect to the on-site environmental management structure together with
the contact information of the key personnel are shown in Appendix B. The key personnel contact names and numbers are
summarized in Table 1.1 and Table 1.2.
Table 1.1 Contact Information of Key Personnel (for Contract No.
HY/2013/03)
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer or
Engineer¡¦s Representative (AECOM Asia Co.
Ltd.) |
Chief Resident Engineer (until 30 Apr 2017) |
Mr. Michael Tovey |
3985 7470 |
3902 8800 |
Chief Resident Engineer (from 01 May 2017 to 31 Oct 2018) |
Mr. W. S. Ng |
3958 7400 |
3902 8800 |
|
Chief Resident Engineer (from 01 Nov 2018) |
Mr. Jason C. Y. Yu |
3152 5102 |
3902 8800 |
|
Environmental
Project Office /
Independent Environmental
Checker (Ramboll Hong Kong Limited) |
Environmental Project Office
Leader |
Mr. Y. H. Hui |
3547 2133 |
3465 2899 |
Independent Environmental Checker (IEC) (until 31 Dec
2018) |
Mr. Raymond Dai |
3465 2888 |
3465 2899 |
|
Independent Environmental Checker (IEC) (from 01 Jan 2019) |
Mr. Ray Yan |
3465 2836 |
3465 2899 |
|
Environmental Site Supervisor (until 31 Dec
2018) |
Mr. Ray Yan |
5181 8165 |
3465 2899 |
|
Environmental Site Supervisor (from 01 Jan 2019) |
Mr. Harris Wong |
5181 8709 |
3465 2899 |
|
Contractor (China Harbour Engineering Co.
Ltd) |
Site Agent |
Mr. Paul Pui |
9125 0700 |
2512 0427 |
Environmental Officer |
Mr. Marko Chan |
9427 2879 |
2512 0427 |
|
Environmental Team (MateriaLab Consultants Limited) |
Environmental Team Leader (ETL) |
Mr. Arthur Cheng |
3565 4115 |
2450 8032 |
24-hr Complaint
Hotline |
-- |
-- |
5236 7111 |
-- |
Table 1.2 Contact Information of Key Personnel (for Contract No.
HY/2013/06 within Contract No. HY/2013/03 works area)
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer or
Engineer¡¦s Representative (AECOM Asia Co.
Ltd.) |
Chief Resident Engineer (until 30 Apr 2017) |
Mr. Michael Tovey |
3985 7470 |
3902 8800 |
Chief Resident Engineer (from 01 May 2017 to 31 Oct 2018) |
Mr. W. S. Ng |
3958 7400 |
3902 8800 |
|
Chief Resident Engineer (from 01 Nov 2018) |
Mr. Jason C. Y. Yu |
3152 5102 |
3902 8800 |
|
Environmental
Project Office /
Independent Environmental
Checker (Ramboll Hong Kong Limited) |
Environmental Project Office
Leader |
Mr. Y. H. Hui |
3547 2133 |
3465 2899 |
Independent Environmental Checker (IEC) (until 31 Dec
2018) |
Mr. Raymond Dai |
3465 2888 |
3465 2899 |
|
Independent Environmental Checker (IEC) (from 01 Jan 2019) |
Mr. Ray Yan |
3465 2836 |
3465 2899 |
|
Environmental Site Supervisor (until 31 Dec 2018) |
Mr. Ray Yan |
5181 8165 |
3465 2899 |
|
Environmental Site Supervisor (from 01 Jan 2019) |
Mr. Harris Wong |
5181 8709 |
3465 2899 |
|
Contractor (ATAL Technologies
Limited) |
Site Agent |
Mr. Eric Yim |
2565 3355 |
3162 5217 |
Environmental Officer |
Mr. W. Li |
2565 3137 |
3162 5217 |
|
Environmental Team (MateriaLab Consultants Limited) |
Environmental Team Leader (ETL) |
Mr. Arthur Cheng |
3565 4115 |
2450 8032 |
24-hr Complaint
Hotline |
-- |
-- |
5236 7111 |
-- |
1.3
Construction
Programme
1.3.1 The construction programme
for Contract No. HY/2013/03 (includes the construction works of
HY/2013/06
within Contract No. HY/2013/03 works area) are provided in Appendix C.