5.    COMMENTS, RECOMMENDATIONS AND CONCLUSIONS

 

5.1          Comments

 

5.1.1      Site inspections were carried out on a weekly basis to monitor the implementation of proper environmental pollution control and mitigation measures for the Contract. During the reporting period, 165 site inspections (includes Contract No. HY/2013/06 within Contract No. HY/2013/03 works area) were carried out from September 2015 to October 2018 (As all the sections under Contract No. HY/2013/03 (includes Contract No. HY/2013/06 within Contract No. HY/2013/03 works area) were handed over to the relevant authorities on 24 October 2018 and the site had been changed to a closed area, no site inspection was conducted from November 2018).

 

5.1.2      Particular observations during the site inspections are described in the monthly EM&A Reports for Contract No. HY/2013/03 (from September 2015 to January 2019). The Contractor has rectified most of the observations as identified during environmental site inspections during the reporting period.

 

5.1.3      A summary of the Implementation Schedule of Environmental Mitigation Measures (EMIS) is presented in Appendix E. All necessary mitigation measures were implemented properly during the reporting period.

 

5.2          Recommendations

 

5.2.1      With implementation of the recommended environmental mitigation measures, the contract’s environmental impacts were considered environmentally acceptable. The weekly environmental site inspections ensured that all the environmental mitigation measures recommended were effectively implemented.

 

5.2.2      The recommended environmental mitigation measures, as included in the EM&A programme, effectively minimize the potential environmental impacts from the Contract. Also, the EM&A programme effectively monitored the environmental impacts from the construction activities and ensure the proper implementation of mitigation measures. No particular recommendation was advised for the improvement of the programme.

 

5.3          Conclusions

 

5.3.1      Commencement of Contract No. HY/2013/03 took place on 10 April 2015 and the construction works of Contract No. HY/2013/03 commenced on 29 August 2015 (commencement of Contract No. HY/2013/06 took place on 14 August 2015 and the construction works of Contract No. HY/2013/06 commenced on 13 September 2016 within Contract No. HY/2013/03 works area). This is the Final EM&A Review Report summarising the findings of EM&A activities conducted under Contract No. HY/2013/03 from 29 August 2015 to 31 January 2019 (includes the findings of EM&A activities conducted under Contract No. HY/2013/06 within Contract No. HY/2013/03 works area from 13 September 2016 to 31 January 2019).

 

5.3.2      Summary of Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6 shall be referred to the monthly EM&A Reports (from September 2015 to January 2019) prepared by Contract No. HY/2011/03.

 

5.3.3      There was one Action Level exceedance of 24-hr TSP level recorded at station AMS3B by the Environmental Team of Contract No. HY/2013/01 on 28 November 2017, one Action Level exceedance of 24-hr TSP level recorded at station AMS3B by the Environmental Team of Contract No. HY/2013/01 on 23 December 2017, and two Action Level exceedances of 24-hr TSP level recorded at station AMS2 and AMS3B by the Environmental Team of Contract No. HY/2013/01 on 17 January 2018 during the reporting period. After investigation, it was concluded that all exceedances were not relevant to Contract No. HY/2013/03.

 

5.3.4      There was no Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level recorded on other monitoring dates at station AMS2, AMS3B/AMS3C and AMS7/AMS7A/AMS7B by the Environmental Team of Contract No. HY/2010/02 (from September 2015 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018), and Contract No. HY/2013/04 (from October 2018 to January 2019).

 

5.3.5      There was no Action and Limit Level exceedance for noise recorded at station NMS2 and station NMS3B/NMS3C by the Environmental Team of Contract No. HY/2010/02 (from September 2015 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018), and Contract No. HY/2013/04 (from October 2018 to January 2019) during the reporting period.

 

5.3.6      There were Action and Limit Level exceedances recorded at different WQM stations recorded on 90 days (marine works were conducted as silt curtain was installed on 11 May 2017 for Contract No. HY/2013/03 and therefore, water quality impact monitoring result is reported from May 2017) by the Environmental Team of Contract No. HY/2010/02 (from May 2017 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018), and Contract No. HY/2013/04 (from October 2018 to January 2019) during the reporting period. The following table summarized the number of exceedance on each sampling date:

 

Table 5.1 Summary of Exceedance for Water Quality Monitoring

Sampling Date

No. of Exceedances

DO

Turbidity

SS

Action

Limit

Action

Limit

Action

Limit

12 Jul 2017

0

0

0

0

1

0

14 Jul 2017

0

0

0

0

1

0

Total: 2 Days

0

0

0

0

2

0

01 Sep 2017

8

0

0

0

0

0

06 Sep 2017

4

4

1

0

3

0

08 Sep 2017

24

4

4

0

2

1

11 Sep 2017

30

3

0

0

0

0

13 Sep 2017

13

3

0

0

0

0

15 Sep 2017

10

2

0

1

0

0

18 Sep 2017

8

2

0

0

1

0

20 Sep 2017

3

2

0

0

1

0

22 Sep 2017

17

4

0

0

0

0

25 Sep 2017

1

1

0

0

1

0

27 Sep 2017

6

1

0

0

0

0

29 Sep 2017

13

0

0

0

0

0

02 Oct 2017

3

1

0

0

0

0

04 Oct 2017

3

4

0

0

0

0

06 Oct 2017

1

2

0

0

0

0

09 Oct 2017

0

1

0

0

0

0

18 Oct 2017

0

0

0

0

1

0

20 Oct 2017

0

0

0

0

3

0

23 Oct 2017

0

0

0

0

1

0

03 Nov 2017

0

0

0

0

3

1

06 Nov 2017

0

0

0

0

5

0

08 Nov 2017

0

0

0

0

2

2

13 Nov 2017

0

0

0

0

1

0

15 Nov 2017

0

0

0

0

1

0

20 Nov 2017

0

0

0

0

1

0

22 Nov 2017

0

0

0

0

1

1

24 Nov 2017

0

0

0

0

1

0

Total: 27 Days

144

34

5

1

28

5

04 Dec 2017

0

0

0

0

3

0

06 Dec 2017

0

0

0

0

4

0

08 Dec 2017

0

0

0

0

4

0

11 Dec 2017

0

0

0

0

1

0

13 Dec 2017

0

0

0

0

1

0

20 Dec 2017

0

0

0

0

1

0

22 Dec 2017

0

0

0

0

2

0

31 Jan 2018

0

0

0

0

1

0

02 Feb 2018

0

0

0

0

2

0

Total: 9 Days

0

0

0

0

19

0

02 Mar 2018

0

0

0

0

1

0

16 Mar 2018

0

0

0

0

1

0

21 Mar 2018

0

0

0

0

1

0

30 Mar 2018

0

0

0

0

1

0

02 Apr 2018

0

0

0

0

1

0

18 Apr 2018

0

0

0

0

2

0

20 Apr 2018

0

0

0

0

1

0

23 Apr 2018

0

0

0

0

1

0

13 May 2018

0

0

2

0

0

0

25 May 2018

1

0

0

0

0

0

28 May 2018

1

0

0

0

0

0

Total: 11 Days

2

0

2

0

9

0

01 Jun 2018

2

0

0

0

0

0

11 Jun 2018

1

0

0

0

0

0

13 Jun 2018

2

0

0

0

0

0

15 Jun 2018

4

0

0

0

0

0

25 Jun 2018

1

0

1

0

0

0

27 Jun 2018

5

0

0

0

0

0

29 Jun 2018

3

2

0

0

0

0

02 Jul 2018

6

0

0

0

0

0

04 Jul 2018

5

0

0

0

0

0

06 Jul 2018

8

5

0

0

0

0

09 Jul 2018

12

9

0

0

0

0

11 Jul 2018

2

0

1

0

0

0

13 Jul 2018

4

2

0

0

3

0

16 Jul 2018

2

2

0

0

2

0

27 Jul 2018

0

0

0

0

1

0

06 Aug 2018

12

4

0

0

0

0

08 Aug 2018

23

4

0

0

0

0

10 Aug 2018

3

2

0

0

4

0

13 Aug 2018

8

3

0

0

1

0

15 Aug 2018

2

1

1

0

0

0

17 Aug 2018

4

3

0

0

0

0

20 Aug 2018

22

2

0

0

0

0

22 Aug 2018

10

0

0

0

0

0

24 Aug 2018

3

0

0

0

1

0

27 Aug 2018

2

1

0

0

0

0

29 Aug 2018

4

1

0

0

0

0

31 Aug 2018

0

1

0

0

1

0

Total: 27 Days

150

42

3

0

13

0

03 Sep 2018

30

4

0

0

0

0

05 Sep 2018

21

5

0

0

0

0

07 Sep 2018

21

1

0

0

0

0

10 Sep 2018

48

12

0

0

1

0

12 Sep 2018

27

2

0

0

1

0

14 Sep 2018

6

4

0

0

0

0

28 Sep 2018

0

1

0

0

0

0

10 Oct 2018

0

0

0

0

1

0

24 Oct 2018

0

0

1

0

0

0

23 Nov 2018

0

0

0

0

3

0

26 Nov 2018

0

0

0

0

2

0

Total: 11 Days

153

29

1

0

8

0

07 Dec 2018

0

0

0

0

1

0

10 Dec 2018

0

0

0

0

1

0

12 Dec 2018

0

0

0

0

3

1

Total: 3 Days

0

0

0

0

5

1

 

5.3.7    After investigation, it was concluded that all exceedances were not relevant to Contract No. HY/2013/03. There was no Action and Limit Level exceedance recorded on other monitoring dates at the monitoring stations as shown at Table 2.2 by the Environmental Team of Contract No. HY/2010/02 (from May 2017 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018), and Contract No. HY/2013/04 (from October 2018 to January 2019) during the reporting period.

 

5.3.8    Ecological monitoring results at all transects are reported in the EM&A Reports (marine works were conducted as silt curtain was installed on 11 May 2017 for Contract No. HY/2013/03 and therefore, ecological monitoring result is reported from May 2017) prepared by Contract No. HY/2010/02 (from May 2017 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018), and Contract No. HY/2013/04 (from October 2018 to January 2019).

 

5.3.9    Eight Limit Level exceedances were recorded for ecological monitoring at all transects by the Environmental Team of Contract No. HY/2010/02 (from May 2017 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018) and Contract No. HY/2013/04 (from October 2018 to January 2019) during the reporting period. The following table summarized the number of exceedance during the reporting period:

 

Table 5.1A Summary of Exceedance for Dolphin Monitoring

Parameters

Action Level

Limit Level

Quarterly Analysis (Mar 2017 to May 2017)

0

1

Quarterly Analysis (Jun 2017 to Aug 2017)

0

1

Quarterly Analysis (Sep 2017 to Nov 2017)

0

1

Quarterly Analysis (Dec 2017 to Feb 2018)

0

1

Quarterly Analysis (Mar 2018 to May 2018)

0

1

Quarterly Analysis (Jun 2018 to Aug 2018)

0

1

Quarterly Analysis (Sep 2018 to Nov 2018)

0

1

Quarterly Analysis (Dec 2018 to Feb 2019)

0

1

 

5.3.10  There was no Action Level exceedance recorded on other monitoring dates for ecological monitoring at all transects by the Environmental Team of Contract No. HY/2010/02 (from May 2017 to August 2017), Contract No. HY/2013/01 (from September 2017 to September 2018) and Contract No. HY/2013/04 (from October 2018 to January 2019) during the reporting period.

 

5.3.11  Environmental site inspection was carried out during the reporting period (includes Contract No. HY/2013/06 within Contract No. HY/2013/03 works area). Recommendations on remedial actions were given to the Contractors for the deficiencies identified during the site inspections.

 

5.3.12  There were fifteen complaints received in relation to the environmental impact during the reporting period. After investigation, all the complaints were not related to Contract No. HY/2013/03.

 

5.3.13  There were no notifications of summons or prosecutions received during the reporting period.

 

5.3.14  As informed by the Contractor, all major construction activities for Contract No. HY/2013/03 have been substantially completed and only minor maintenance works will be carried out on site upon request. All land areas have been handed over to relevant responsible parties. The EM&A requirement of landscape soft works for establishment phase was appropriately arranged. After reviewing the existing environmental conditions of the site, it is considered that the potential environmental impacts associated with the remaining works are insignificant and therefore propose to terminate the Construction Phase EM&A Programme under Contract No. HY/2013/03. Independent Environmental Checker (IEC) verified the proposal for termination of EM&A programme under Contract No. HY/2013/03 on 30 November 2018. Environmental Protection Department’s (EPD’s) memo reference ( ) in E771/E1/100 dated 01 February 2019 informing no comment on the proposal for termination of EM&A programme for Contract No. HY/2013/03.