8.
CONCLUSIONS
8.1 Commencement of
the Contract took place on 10 April 2015. The commencement date for
construction works and the EM&A programme of the Contract commenced on 29
August 2015.
8.2 Summary
of Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at
AMS6 shall be referred to the monthly EM&A report prepared by Contract No. HY/2011/03.
8.3 There
was no Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level
recorded at station AMS7A by the Environmental Team of Contract No. HY/2010/02 during the reporting period.
8.4 There
was no Action and Limit Level exceedance for noise recorded at station NMS2 and
station NMS3B by the Environmental Team of Contract No. HY/2010/02
during the reporting period.
8.5 There was no
marine works conducted during the reporting period and therefore, no water
quality impact monitoring result is reported.
8.6 There
was no marine transportation and operation during the reporting period and
therefore, no ecology monitoring result is reported.
8.7 Environmental
site inspections were carried out on 3, 10, 17, 23 and 31 December 2015.
Recommendations on remedial actions were given to the Contractor for the
deficiencies identified during the site inspections.
8.8 There
were no complaints received in relation to the environmental impact during the
reporting period.
8.9 There
were no notifications of summons or prosecutions received during the reporting
period.