1.
INTRODUCTION
1.1 Background
1.1.1 MateriaLab
Consultants Limited was commissioned by China Harbour Engineering Co. Limited
(also referred to as ˇ§the Contractorˇ¨) to undertake the Environmental Team (ET)
services (including environmental monitoring and audit (EM&A)) for Contract
No. HY/2013/03 ˇ§Hong Kong-Zhuhai-Macao Bridge Hong Kong
Boundary Crossing Facilities ˇV Vehicle Clearance Plazas and Ancillary Buildings
and Facilitiesˇ¨ (ˇ§the Contractˇ¨) for the Highways Department of Hong Kong
Special Administrative Region (HKSAR).
1.1.2 The Contract is part of Hong
KongˇVZhuhaiˇVMacao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) which
is ˇ§Designated Projectsˇ¨, under Schedule 2 of the Environmental Impact
Assessment Ordinance (EIAO) (Cap 499) and for which an EIA Report
(Register No. AEIAR-145-2009) was prepared and approved. The current
Environmental Permit (EP) for HKBCF, namely No. EP- 353/2009/I, was issued on
17 July 2015. These documents are available through the EIA Ordinance. The general layout of the Project area is shown in Appendix
A.
1.1.3 This is the forth EM&A report
to document the findings of site inspection activities and EM&A programme
carried out by the Contractor from 1 December 2015 to 31 December 2015
(reporting period) under Contract No. HY/2013/03 and is submitted to fulfil
Condition 5.4 of the EP.
1.2 Project
Description
1.2.1 The works to be executed under
this Contract include the following major items:
a. Cargo clearance facilities including kiosks
for clearance of good vehicles, customs inspection platforms, X-ray building,
etc.;
b. Passenger related facilities including
processing kiosks and examination facilities for private cars and coaches,
annexure for examination of accompanying passengers of private cars, etc.;
c. Accommodation/offices for the facilities
(like fire station, police station, buildings for Immigration Department [ImmD], Hong Kong Customs and Excise Department [C&ED],
Agriculture, Fisheries and Conservation Department [AFCD], Food and
Environmental Hygiene Department [FEHD], Department of Health [DofH]
etc.) of the Government departments providing services in connection with the
HKBCF;
d. Provision of transport and miscellaneous facilities
inside the HKBCF including public transport interchange (PTI), transport
drop-off and pick-up areas, vehicle holding areas, passenger queuing areas,
road networks, footbridges, fencing, sewerage and drainage systems, sewage
treatment plant and treated effluent disposal facilities, water supply system,
building services works, electronic system, and traffic control and information
system including traffic control and surveillance system (TCSS), etc.;
e. Provision of roads connecting the BCF to the
Hong Kong Link Road (HKLR), the Tuen Mun ˇV Chek Lap Kok Link (TM-CLKL) and the Hong Kong International Airport
(HKIA), expect the part of road works in HKIA entrusted to the HKLR project;
and
f. Reprovisioning of the affected
HKIAˇ¦s facilities, expect those affected by the Automated People Mover (APM)
system such as the existing east rescue berth.
1.3 Project
Organisation
1.3.1 The
Project Organisation for Environmental Works is shown in Appendix B. The
contact person and telephone numbers of key personnel for the captioned project
are shown in Table 1.1:
Table
1.1 Contact Persons and Telephone Numbers of Key Personnel
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer or Engineerˇ¦s Representative (AECOM Asia Co. Ltd.) |
Chief Resident Engineer |
Mr. Michael Tovey |
3985 7470 |
3902 8800 |
Environmental Project Office / Independent Environmental Checker (Ramboll Environ Hong Kong Limited) |
Environmental Project Office Leader |
Mr. Y. H. Hui |
3547 2133 |
3465 2899 |
Independent Environmental Checker (IEC) |
Mr. Raymond Dai |
3465 2888 |
34652899 |
|
Environmental Site Supervisor |
Mr. Ray Yan |
5181 8165 |
3465 2899 |
|
Contractor (China Harbour Engineering Co. Ltd) |
Site Agent |
Mr. Paul Pui |
9125 0700 |
2512 0427 |
Environmental Officer |
Mr. Marko Chan |
9427 2879 |
2512 0427 |
|
Environmental Team (MateriaLab Consultants Limited) |
Environmental Team Leader (ETL) |
Mr. Arthur Cheng |
3565 4115 |
2450 8032 |
24-hr Complaint Hotline |
-- |
-- |
5236 7111 |
-- |
1.3.2 The Contract HY/2013/03
has commenced on 10 April 2015. The commencement of construction works and the
EM&A programme have commenced on 29 August 2015.
1.4 Construction
Programme
1.4.1 The construction programme is
provided in Appendix C.
1.5 Construction
Works Undertaken during the Reporting Period
1.5.1 The
construction works of this Contract commenced on 29 August 2015. During this
reporting period, the following major site activities were commenced:
n Site Investigation at
Portion A1, A2 & G;
n Piling at Portion A1,
A6, A7a;
n Building &
Drainage at Portion A1; and
n
CUE
Construction at Portion B.