3.            NOISE MONITORING

3.1          Monitoring Locations

3.1.1     The noise monitoring works for the Contract are covered by Contract No. HY/2013/01 “Hong Kong-Zhuhai-Macao Bridge HKBCF – Passenger Clearance Building”. The ET of the Contract or another ET of the HZMB project is required to conduct noise monitoring at NMS2 and NMS3B as part of EM&A programme if these monitoring stations are no longer covered under Contract No. HY/2013/01. Figure 2 shows the locations of noise monitoring stations.

Table 3.1 Construction Noise Monitoring Location

ID No.

Description

NMS2

Seaview Crescent

NMS3B

Site Boundary of Site Office Area at WA2

3.2          Monitoring Requirements

3.2.1     The monitoring requirements, monitoring equipment, monitoring parameters, frequency and duration, monitoring methodology and monitoring schedule are detailed in the monthly EM&A Reports prepared for Contract No. HY/2013/01.

3.2.2     The Action and Limit Levels for construction noise are defined in Table 3.2.

Table 3.2 Action and Limit Level for Construction Noise

Monitoring Station

Action Level

Limit Level

For the Time Period 0700-1900 hrs. on Normal Weekdays

NMS2

When one documented complaint is received

75.0 dB (A) Leq (30 min.)

NMS3B

70.0 dB (A) Leq (30 min.)*

Notes: If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the Noise Control Authority have to be followed.

* Reduce to 70 dB(A) for schools and 65 dB(A) during school examination period

3.3          Monitoring Results

3.3.1     The monitoring results for NMS2 and NMS3B are reported in the monthly EM&A Reports prepared for Contract No. HY/2013/01. No noise exceedance was recorded at stations NMS2 and NMS3B by the ET of Contract No. HY/2013/01 during the reporting period.