8. FUTURE KEY ISSUES
8.1 Construction Programme for the Coming Months
8.1.1 As informed by the Contractor, the following are the major construction activities anticipated in December 2017:
For Contract No. HY/2013/03
1. Building at Portion A1, B, G, N, J, STP & Pumping Stations;
2. CUE Construction at Portion B, C & J;
3. Drainage & Sewerage Work, Water Main & Cable Duct at Portion B, H1, H2, J, P, G & A1;
4. Radiation Screen Wall at Portion B, E P, N, M, C;
5. Sign Gantry Footing at Portion B;
6. Sewerage Pumping Station, High Mast Lighting Foundation & Box Culvert C at Portion G;
7. Bridge Works at A1 to A9;
8. Site Foundation Works at Portion K;
9. Cover Walkway at Portion H1 & H2;
10. Box Culvert B at Portion N;
11. Shuttle kiosk & Subway at Portion E.
For Contract No. HY/2013/06 within Contract No. HY/2013/03 works area
1. CUE, Kiosk & Building 037.