9.
CONCLUSIONS
9.1
Commencement
of Contract No. HY/2013/03 took place on 10 April 2015. The commencement date for
construction works and the EM&A programme of Contract No. HY/2013/03 commenced
on 29 August 2015 (commencement of Contract No. HY/2013/06 took place on 14
August 2015. The commencement date for construction works and the EM&A
programme of Contract No. HY/2013/06 commenced on 13 September 2016 within
Contract No. HY/2013/03 works area).
9.2
Summary
of Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6
shall be referred to the monthly EM&A report prepared by Contract No.
HY/2011/03.
9.3
There
was no Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level
recorded at station AMS2, AMS3B and AMS7B by the Environmental Team of Contract
No. HY/2013/01 during the reporting period.
9.4
There
was no Action and Limit Level exceedance for noise recorded at station NMS2 and
station NMS3B by the Environmental Team of Contract No. HY/2013/01 during the
reporting period.
9.5
Summary
of Action and Limit Level exceedance of water quality at the monitoring
stations shown as shown at Table 4.1
shall be referred to the monthly EM&A report prepared by Contract No.
HY/2013/01.
9.6
There were
Action Level exceedances on twelve days by the Environmental Team of Contract
No. HY/2013/01 during reporting period. After investigation, it was concluded
that all exceedances were not relevant to Contract No. HY/2013/03. There was no
Action and Limit Level exceedance recorded on other monitoring dates at the
monitoring stations shown as shown at Table
4.1 by the Environmental Team of Contract No. HY/2013/01 during the
reporting period.
9.7
Ecological
monitoring results at all transects are reported in the EM&A report
prepared by Contract No. HY/2013/01.
9.8
Environmental
site inspections were carried out on 2, 6, 17, 23 and 30 August 2018. Recommendations
on remedial actions were given to the Contractor for the deficiencies
identified during the site inspections.
9.9
There
was no complaint received in relation to the environmental impact during the
report period.
9.10
There
were no notifications of summons or prosecutions received during the reporting
period.