9.
CONCLUSIONS
9.1
Commencement
of Contract No. HY/2013/03 took place on 10 April 2015. The commencement date for
construction works and the EM&A programme of Contract No. HY/2013/03 commenced
on 29 August 2015 (commencement of Contract No. HY/2013/06 took place on 14
August 2015. The commencement date for construction works and the EM&A
programme of Contract No. HY/2013/06 commenced on 13 September 2016 within
Contract No. HY/2013/03 works area).
9.2
Summary
of Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6
shall be referred to the monthly EM&A report prepared by Contract No.
HY/2011/03.
9.3
There
was no Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level
recorded at station AMS2, AMS3C and AMS7B by the Environmental Team of Contract
No. HY/2013/04 during the reporting period.
9.4
There
was no Action and Limit Level exceedance for noise recorded at
station NMS2 and NMS3C by the Environmental Team of Contract No. HY/2013/04
during the reporting period.
9.5
Summary
of Action and Limit Level exceedance of water quality at the monitoring
stations shown as shown at Table 4.1
shall be referred to the monthly EM&A report prepared by Contract No.
HY/2013/04.
9.6
There
were Action Level exceedance of water quality recorded on three days by the
Environmental Team of Contract No. HY/2013/04 during reporting period. After
investigation, it
was concluded that all exceedances were not relevant to Contract No.
HY/2013/03. There was
no Action and Limit Level exceedance recorded on other monitoring dates at the
monitoring
stations shown as shown at Table 4.1
by the Environmental Team of Contract No. HY/2013/04
during the reporting period.
9.7
Ecological
monitoring results at all transects are reported in the EM&A report
prepared by Contract No. HY/2013/04.
9.8
No
site inspection was carried out during the reporting period as all the sections
under Contract No. HY/2013/03 and HY/2013/06 were handed over to the relevant
authorities on 24 October 2018 and the site had been changed to a closed area.
9.9
There
was no complaint received in relation to the environmental impact during the
report period.
9.10 There were no notifications of summons
or prosecutions received during the reporting period.