1.
INTRODUCTION
1.1
Basic Project
Information
1.1.1
This Quarterly Environmental Monitoring and Audit
(EM&A) Report is prepared for Contract No. HY/2013/03 ¡§Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities ¡V Vehicle
Clearance Plazas and Ancillary Buildings and Facilities¡¨ (includes the
construction works of Contract No. HY/2013/06 ¡§Hong Kong-Zhuhai-Macao Bridge
Hong Kong Boundary Crossing Facilities ¡V Automatic Vehicle Clearance Support
System¡¨ within Contract No. HY/2013/03 works area) (hereafter referred to as
¡§the Contract¡¨) for the Highways Department of Hong Kong Special Administrative
Region (HKSAR). The Contract was awarded to China Harbour Engineering Co.
Limited (construction works of Contract No. HY/2013/06 was awarded to ATAL
Technologies Limited within Contract No. HY/2013/03 works area) (hereafter
referred to as ¡§the Contractor¡¨) and MateriaLab
Consultants Limited (MCL) was appointed as the Environmental Team (ET) by the
Contractor.
1.1.2
Contract No. HY/2013/03 (includes the construction
works of Contract No. HY/2013/06 within Contract No. HY/2013/03 works area) is
part of the ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing
Facilities¡¨ (HZMB HKBCF) Project which is a ¡§Designated Project¡¨ under Schedule
2 of the Environmental Impact Assessment (EIA) Ordinance (Cap. 499) and for which
an EIA Report (Register No. AEIAR-145/2009) was prepared and approved. The
current Environmental Permit (EP) for HKBCF, namely No. EP-353/2009/K, was
issued on 11 April 2016. These documents are available through the EIA
Ordinance Register. Commencement of Contract No. HY/2013/03 took place on 10
April 2015 while the construction works and the EM&A programme of Contract
No. HY/2013/03 commenced on 29 August 2015 (commencement of Contract No.
HY/2013/06 took place on 14 August 2015 while the construction works and the
EM&A programme of Contract No. HY/2013/06 within Contract No. HY/2013/03
works area commenced on 13 September 2016). The works areas of the contract are
shown in Appendix A.
1.1.3
This is the 10th Quarterly EM&A Report
summarising the findings of EM&A activities conducted under Contract No.
HY/2013/03 from 01 December 2017 to 28 February 2018 (from 01 December 2017 to
28 February 2018 for the construction works of Contract No. HY/2013/06 within
Contract No. HY/2013/03 works area) (the ¡§reporting period¡¨) and is submitted
to fulfil Condition 16.4 of the Updated EM&A Manual for HKBCF.
1.2
Project
Organisation
1.2.1
The
organisation chart and lines of communication with respect to the on-site
environmental management structure together with the contact information of the
key personnel are shown in Appendix B.
The key personnel contact names and numbers are summarized in Table 1.1 and Table 1.2.
Table
1.1 Contact Information of Key Personnel (for Contract No. HY/2013/03)
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer or
Engineer¡¦s Representative (AECOM Asia
Co. Ltd.) |
Chief Resident Engineer |
Mr. W. S. Ng |
3958 7400 |
3902 8800 |
Environmental
Project Office / Independent Environmental Checker (Ramboll Hong Kong Limited) |
Environmental
Project Office Leader |
Mr. Y. H.
Hui |
3547 2133 |
3465 2899 |
Independent
Environmental Checker (IEC) |
Mr. |
3465 2888 |
3465 2899 |
|
Environmental
Site Supervisor |
Mr. Ray Yan |
5181 8165 |
3465 2899 |
|
Contractor (China
Harbour Engineering Co. Ltd) |
Site Agent |
Mr. Paul Pui |
9125 0700 |
2512 0427 |
Environmental
Officer |
Mr. Marko Chan |
9427 2879 |
2512 0427 |
|
Environmental
Team (MateriaLab Consultants Limited) |
Environmental
Team Leader (ETL) |
Mr. Arthur
Cheng |
3565 4115 |
2450 8032 |
24-hr
Complaint Hotline |
-- |
-- |
5236 7111 |
-- |
Table
1.2 Contact Information of Key Personnel (for Contract No. HY/2013/06 within
Contract No. HY/2013/03 works area)
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer or
Engineer¡¦s Representative (AECOM Asia
Co. Ltd.) |
Chief Resident Engineer |
Mr. W. S. Ng |
3958 7400 |
3902 8800 |
Environmental
Project Office / Independent Environmental Checker (Ramboll Hong Kong Limited) |
Environmental
Project Office Leader |
Mr. Y. H.
Hui |
3547 2133 |
3465 2899 |
Independent
Environmental Checker (IEC) |
Mr. |
3465 2888 |
3465 2899 |
|
Environmental
Site Supervisor |
Mr. Ray Yan |
5181 8165 |
3465 2899 |
|
Contractor (ATAL Technologies
Limited) |
Site Agent |
Mr. Eric Yim |
2565 3355 |
3162 5217 |
Environmental
Officer |
Mr. W. Li |
2565 3137 |
3162 5217 |
|
Environmental
Team (MateriaLab Consultants Limited) |
Environmental
Team Leader (ETL) |
Mr. Arthur
Cheng |
3565 4115 |
2450 8032 |
24-hr
Complaint Hotline |
-- |
-- |
6509 0375 |
-- |
1.3
Construction
Programme
1.3.1
The
construction programme for Contract No. HY/2013/03 (includes the construction
works of HY/2013/06 within Contract No. HY/2013/03 works area) are provided in Appendix C.
1.4
Construction
Works undertaken during the Reporting Period
1.4.1
A summary of the construction activities undertaken
during this reporting period is shown below:
For
Contract No. HY/2013/03
December 2017
1. Building at Portion A1, B, G, N, J, STP
& Pumping Stations;
2. CUE Construction at Portion B, C &
J;
3. Drainage & Sewerage Work, Water Main
& Cable Duct at Portion B, H1, H2, J, P, G & A1;
4. Radiation Screen Wall at Portion B, E,
P, N, M, C;
5. Sign Gantry Footing at Portion B;
6. Sewerage Pumping Station, High Mast
Lighting Foundation & Box Culvert C at Portion G;
7. Bridge Works at A1 to A9;
8. Site Foundation Works at Portion K;
9. Cover Walkway at Portion H1 & H2;
10. Box Culvert B at Portion N;
11. Shuttle kiosk & Subway at Portion E.
January 2018
1. Building at Portion A1, B, G, N, J, STP
& Pumping Stations;
2. CUE Construction at Portion B, C &
J;
3. Drainage & Sewerage Work, Water Main
& Cable Duct at Portion A1, B, H1, H2, J, P & G;
4. Fencing work at All site Area;
5. Sewerage Pumping Station at Portion A1
& G;
6. Slope Works at Portion K;
7. Cover Walkway at Portion B, C, J &
K;
8. Box Culvert B at Portion N;
9. Shuttle kiosk & Subway at Portion E;
10. Road Work at All site area;
11. Landscape work at All site area.
February 2018
1. Building at Portion A1, B, G, N, J, STP
& Pumping Stations;
2. CUE Construction at Portion B, C &
J;
3. Drainage & Sewerage Work, Water Main
& Cable Duct at Portion A1, B, H1, H2, J, P & G;
4. Fencing work at All site Area;
5. Sewerage Pumping Station at Portion A1
& G;
6. Slope Works at Portion K;
7. Cover Walkway at Portion B, C, J &
K;
8. Box Culvert B at Portion N;
9. Shuttle kiosk & Subway at Portion E;
10. Road Work at All site area;
11. Landscape work at All site area.
For Contract
No. HY/2013/06 within Contract No. HY/2013/03 works area
December 2017
1.
Conduits
& Wiring installation at Building 037, kiosk and CUE works area.
January 2018
1. CUE, Kiosk & Building 037.
February 2018
1. CUE, Kiosk & Building 037.