Contract No. HY/2014/05
Hong Kong-Zhuhai-Macao Bridge
Hong Kong
Boundary Crossing Facilities ¡V Remaining Ancillary Buildings and Facilities
Monthly EM&A Report
No. 4
(Covering the Period
from 1 June 2016 to 30 June 2016)
14 Jul 2016
Revision 1
Main Contractor Environmental
Team
Contents
Executive
Summary
1.4 Construction
Works Undertaken During the Reporting Period
2....... Air Quality Monitoring
4....... Environmental Site Inspection and Audit
4.2 Advice
on the Solid and Liquid Waste Management Status
4.3 Environmental
Licenses and Permits
4.4 Implementation Status of Environmental
Mitigation Measures
4.5 Summary of Exceedance of the Environmental
Quality Performance Limit
4.6 Summary of Complaints, Notification of
Summons and Successful Prosecution
5.1 Construction Programme for the Coming Months
5.2 Environmental Site Inspection Schedule for
the Coming Month
Figures
Figure 2.1 Location
of Air Quality
Monitoring Stations
Figure 3.1 Location
of Noise Monitoring Stations
Appendices
Appendix A Location
of Works Areas
Appendix B Project
Organization for Environmental Works
Appendix C Construction
Programme
Appendix D Event and
Action Plan
Appendix F Environmental
Licenses and Permits
Appendix G Implementation
Schedule for Environmental Mitigation Measures (EMIS)
Executive Summary
This
monthly Environmental Monitoring and Audit (EM&A) Report is prepared for
Contract HY/2014/05 Hong Kong-Zhuhai-Macao Bridge
Hong Kong Boundary Crossing Facilities (HKBCF) ¡V Remaining Ancillary
Buildings and Facilities (hereafter referred to as ¡§the Contract¡¨) for the
Highways Department of Hong Kong Special Administrative Region (HKSAR). The
Contract was awarded to Leighton ¡V Chun Wo
Joint Venture (hereafter referred to as ¡§the Contractor¡¨) and Atkins China
Limited was appointed as the Environmental Team (ET) by the Contractor.
The
Contract is part of Hong Kong ¡V Zhuhai ¡V Macao Bridge
HKBCF which is a ¡§Designated Project¡¨, under Schedule 2 of the Environmental Impact
Assessment Ordinance (EIAO) (Cap 499) and Environmental Impact Assessment (EIA)
Report (Register No. AEIAR-145/2009) was prepared for the Project. The current Environmental Permit (EP) No. EP-353/2009/K for HKBCF was issued on 11 April 2016.
These documents are available through the EIA Ordinance Register. The
construction works
of the
Contract
commenced on 29 February 2016.
Atkins
China Limited has been appointed by the Contractor to implement the
Environmental Monitoring & Audit (EM&A) programme for the Contract in
accordance with the Updated EM&A Manual for HKBCF (Version 1.0) and
will be providing environmental team services to the Contract.
This
is the fourth monthly EM&A Report for the Contract which summarizes findings of
the EM&A works during the reporting period from 1 to 30 June 2016.
Environmental Monitoring and Audit Progress
The
monthly EM&A programme was undertaken in accordance with the Updated
EM&A Manual for HKBCF (Version 1.0). It should be noted that the air quality
and noise monitoring works for the Contract are covered by
Contract No. HY/2010/02 Hong Kong-Zhuhai-Macao Bridge HKBCF ¡V
Reclamation Works and Contract No. HY/2011/03 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V
Section between Scenic Hill and HKBCF.
The ET of the Contract or another ET of the HZMB project is required to
conduct impact air quality monitoring at AMS6 and AMS7 and noise monitoring at
NMS2 and NMS3B as part of EM&A programme if these monitoring stations are
no longer covered under Contract Nos. HY/2010/02 and
HY/2011/03. However, this is subject
to ENPO¡¦s final decision on which ET should carry out the monitoring work at
these stations.
The dates of site inspection during the reporting period are listed below:
Environmental
Site Inspection: 1,
8, 15, 22 and 29 June 2016
Breaches of Action and Limit Levels
Summary
of Action and Limit Level exceedance of 1-hr TSP
level and 24-hr TSP level at AMS6 shall be referred to the monthly EM&A
report prepared by Contract No. HY/2011/03.
There
was no Action and Limit Level exceedance of 1-hr TSP
level and 24-hr TSP level recorded at AMS7 by the Environmental Team of
Contract No. HY/2010/02 during the reporting period.
There
was no Action and Limit Level exceedance for noise
recorded at NMS2 and NMS3B by the Environmental Team of Contract No. HY/2010/02 during the reporting period.
Complaint Log
There
were no complaints received in relation to the environmental impact during the
reporting period.
Notifications of Summons
and Successful Prosecutions
There were
no notifications of summons or prosecutions received during this reporting
period.
Reporting Change
There was no reporting change during the
reporting period.
Future Key Issues
The
future key issues to be undertaken in the upcoming month include:
¡P
Earth
Works for Buildings Inbound Private Car Annexure (Building 025) and Inbound
X-Ray Scan Tunnel (Building 058);
¡P
Binding
of Buildings 025 and 058; and
¡P
Construction
of Reinforced Concrete Structure of Outbound X-Ray Scan Building (Building
053), Building 058 and Inbound X-Ray Scan Building (Building 059).
(i)
Construction of the following
ancillary buildings and facilities including architectural and builder works,
structural steel canopy, reinforced concrete frames, foundations, curtain wall
facade, building services and electrical and mechanical works:
•
Public Toilets at Vehicle Clearance
Plaza (VCP);
•
Customs and Excise Department
(C&ED) Dangerous Good Store;
•
Customs Detective Dog Base Building;
•
C&ED Outbound Cargo Examination
Building and Examination Platform;
•
Inbound Private Car Annexure;
•
Outbound Private Car Annexure;
•
E&M maintenance Building;
•
Highways Depot & Administration
Building;
•
Outbound X-ray Building;
•
Outbound X-ray Scan Tunnel; and
•
Inbound X-ray Scan Tunnel.
(ii)
Construction of civil provisions,
cable containment and power supply for the following systems:
•
Extra Low Voltage (ELV) installed by
Contract No. HY/2013/03;
•
Automatic Vehicle Clearance Support
System (AVCSS) installed by Contract No. HY/2013/06; and
•
Gantry Type X-ray Vehicle Inspection
System installed by Contract No. HY/2014/04.
(iii)
Supply and installation of Mobile
X-ray Vehicle Inspection System and other standalone equipment;
(iv)
Construction of minor civil
engineering works at the periphery of buildings;
(v)
Construction of minor Landscape hardworks and softworks; and
(vi)
Other works which are shown on
Drawings or specified in the Specification or which may be ordered in
accordance with the Contract.
Table 1‑1 Contact
Information of Key Personnel
Party |
Position |
Name |
Telephone |
Fax |
Engineer or Engineer¡¦s Representative |
Chief Resident Engineer |
Darrel Kingan |
3958 7339 |
3468 2076 |
Environmental Project Office / Independent Environmental Checker (Ramboll Environ Hong Kong Limited) |
Environmental Project Office Leader |
Y. H. Hui |
3465 2888 |
3465 2899 |
Independent Environmental Checker |
Raymond Dai |
3465 2888 |
3465 2899 |
|
Contractor |
Site Agent |
Albert Chan |
3973 0514 |
3621 0180 |
Environmental Officer |
Donald Ip |
6461 8635 |
3621 0180 |
|
Environmental Team |
Environmental Team Leader |
Sharifah Or |
2972 1802 |
2890 6343 |
24 hours complaint
hotline |
--- |
--- |
3958 7300 |
--- |
¡P
Earth
Works for Earth Works for Inbound Private Car Annexure (Building 025), Outbound
X-Ray Scan Building (Building 053) and Inbound X-Ray Scan Tunnel (Building
058);
¡P
Binding
of Buildings 025, 053 & 058;
¡P
Construction
of RC Structure of Inbound X-Ray Scan Building (Building 059); and
¡P
Temporary
Drainage System of WA3 Storage Area.
Table 2‑1 Construction
Dust Monitoring Locations
ID |
Location
Description |
AMS 6(1) |
Dragonair/CNAC (Group)
Building |
AMS 7(1) |
Hong Kong SkyCity Marriott
Hotel |
Remark:
(1) The ET of this Contract should conduct impact air
quality monitoring at the AMS listed in the table as part of EM&A programme according to the latest notification from ENPO when the monitoring
station(s) is/are no longer covered by another ET of the HZMB project.
Table 2‑2 Action
and Limit Levels for 1-hour TSP
Monitoring Station |
Action Level, µg/m3 |
Limit Level, µg/m3 |
AMS 6 ¡V Dragonair / CNAC
(Group) Building (HKIA) |
360 |
500 |
AMS 7 - Hong Kong SkyCity Marriott
Hotel |
370 |
Table 2‑3
Action
and Limit Levels for 24-hour TSP
Monitoring Station |
Action Level, µg/m3 |
Limit Level, µg/m3 |
AMS 6 ¡V Dragonair / CNAC
(Group) Building (HKIA) |
173 |
260 |
AMS 7 - Hong Kong SkyCity
Marriott Hotel |
183 |
Table 3‑1 Construction
Noise Monitoring Locations
ID |
Location Description |
NMS2(1) |
Seaview Crescent |
NMS3B(1)(2) |
Site
Boundary of Site Office
Area at Works Area WA2 |
Remarks:
(1)
The ET of
this Contract should conduct impact noise monitoring at the NMS listed in the
table as part of EM&A programme according to the latest notification from ENPO when the monitoring
station(s) is/are no longer covered by another ET of the HZMB project.
(2)
The Action
and Limit Levels for schools will be applied for this alternative monitoring
location.
Table 3‑2 Action
and Limit Level for Construction Noise
Parameter |
Action Level |
Limit Level |
07:00 ¡V 19:00 hours
on normal weekdays |
When one
documented complaint is received |
75 dB(A)* |
Notes :
If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the Noise Control Authority have to be followed.
* Limit level is 70 dB(A) for schools and 65 dB(A) during school
examination period.
Table 4‑1 Summary
of Environmental Site Inspections
Date of Audit |
Observations |
Actions Taken by Contractor /
Recommendation |
Date of Observations Closed |
1 June 2016 |
1. A chemical container was found without
drip tray at Building 059 Area. |
1. The chemical container was removed at
Building 059 Area |
8 June 2016 |
8 June 2016 |
1. The Environmental Permit and
Construction Noise Permit of the Contract were not displayed near site
entrance of Building 059 Area. |
1. The Environmental Permit and Construction
Noise Permit of the Contract were displayed near the site entrance of
Building 059 Area. |
15 June 2016 |
15 June 2016 |
No
particular environmental issue was recorded during the site inspection. |
NIL |
NIL |
22 June 2016 |
No
particular environmental issue was recorded during the site inspection. |
NIL |
NIL |
29 June 2016 |
No
particular environmental issue was recorded during the site inspection. |
NIL |
NIL |
Table 5.1 Construction
Activities for July 2016
Site Area |
Description of Activities |
Buildings 025 and 058 |
Earth Works |
Buildings 025 and 058 |
Binding |
Buildings 053, 058 and 059 |
Construction of Reinforced Concrete
Structure |