Summary of Site Audit in the Reporting Month
Parameters |
Date |
Observations and Recommendations |
Follow-up |
|
Air
Quality |
20
May 2020 |
Observation: The
contractor was reminded to maintain housekeeping to prevent dust leaving from
the site. (Near
building 023) |
22
May 2020 |
|
Noise |
NA |
|||
Water
Quality |
13 May 2020 |
Observation: Silt
insider the U-channel should be cleared. (SPTI) |
15 May 2020 |
|
27 May 2020 |
Observation: The contractor was reminded surface water should
be controlled properly to prevent flowing outside. (SPTI) |
29 May 2020 |
||
Chemical
and Waste Management |
6 May 2020 |
Observation: The
contractor was reminded to maintain housekeeping. (NPTI) |
8 May 2020 |
|
Land
Contamination |
NA |
|||
Landscape
and Visual Impact |
NA |
|||
Permit /
Licenses |
NA |
|||
Others |
NA |
|||