Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

20 May 2020

Observation:

The contractor was reminded to maintain housekeeping to prevent dust leaving from the site.

(Near building 023)

22 May 2020

Noise

NA

Water Quality

13 May 2020

Observation:

Silt insider the U-channel should be cleared. (SPTI)

15 May 2020

27 May 2020

Observation:

The contractor was reminded surface water should be controlled properly to prevent flowing outside. (SPTI)

29 May 2020

Chemical and Waste Management

6 May 2020

Observation:

The contractor was reminded to maintain housekeeping. (NPTI)

8 May 2020

Land Contamination

NA

Landscape and Visual Impact

NA

Permit / Licenses

NA

Others

NA