·
Security
measure at existing gate at SPTI (land-based);
·
Recessed
Cover at SPTI and NPTI (land-based);
·
Minor
Works at PCB (land-based);
·
Excavation
at VCP and WA3 (land-based);
·
Road
& Drain works at SPTI and NPTI (land-based);
·
Vertical
access at PCB (land-based);
·
Covered
Walkway at SPTI and NPTI (land-based);
·
Public
Toilet at NPTI (land-based);
·
Kiosks
Construction at VCP (land-based);
·
Landscape
Works at G1 and G5 (land-based);
·
Conceal
Conduits Works at VCP (land-based);
·
Resurfacing
Works at BCF (land-based);
·
Ground
Investigation at G1 and near Seawall (North & West) (land-based).