1.
2.
3.
4.
5.
6.
7.
IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE
The Contractor
had implemented environmental mitigation measures and requirements as stated in
the EIA Reports, the EP and EM&A Manuals. The implementation status of the
environmental mitigation measures during the reporting period is summarized in Appendix J.