1.
2.
3.
4.
5.
6.
9.1.1
1-hour
TSP and 24-hour TSP impact monitoring at AMS2, AMS3C and AMS7B were carried out
in the reporting month, no Action / Limit Level exceedance was recorded during
the period.
9.1.2
Summary
of Action and Limit Level exceedance of 1-hour TSP level and 24-hour TSP level
at AMS6 shall be referred to the monthly EM&A report prepared by Contract
No. HY/2011/03.
9.1.3
Construction
noise monitoring were carried out in the reporting month, no Action / Limit
Level exceedance was recorded during the period.
9.1.4
Based
on previous dolphin surveys conducted for the HZMB project, monthly variation
in dolphin occurrence within the survey areas was observed. Hence, it is more
suitable to assess whether post-construction activities of the HKBCF have
adverse impacts on dolphin occurrence every quarter where monthly comparison of
distribution, group size, and encounter rates will be conducted.
9.1.5
Four
environmental site inspections were carried out in the reporting month.
Recommendations on mitigation measures for air quality impact were
given to the
Contractor for remediating the deficiencies identified during the site
inspections.
9.1.6
Two
Bi-weekly Landscape and Visual Site audits were carried out by a Registered
Landscape Architect in the reporting month.
9.1.7
Referring
to the Contractor¡¦s information, no environmental complaint, notification of
summons and successful prosecution was received in the reporting month.
9.2.1
The
recommended environmental mitigation measures, as proposed in the EIA reports
and EM&A Manuals shall be effectively implemented to minimize the potential
environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
9.2.2
According
to the environmental site inspections performed in the reporting month, the
following recommendations were provided:
Air
Quality Impact
¡P
Contractor
was reminded washing facilities should be provided at all exit.
¡P
Contractor
was reminded washing facilities should be a proper function.
¡P
Contractor
was reminded dusty material should be cleared.
Construction
Noise Impact
¡P
No
specific observation was identified in the reporting month.
Water Quality Impact
¡P
No
specific observation was identified in the reporting month.
Chemical
and Waste Management
¡P
No
specific observation was identified in the reporting month.
Landscape
and Visual Impact
¡P
No
specific observation was identified in the reporting month.
Permit/
Licenses
¡P
No
specific observation was identified in the reporting month.