1.
2.
3.
4.
5.
6.
7.
8.
9.
CONCLUSION AND RECOMMENDATION
9.1.1
1-hour TSP and 24-hour TSP impact monitoring at AMS2 and AMS3C were
carried out in the reporting month, no Action / Limit Level exceedance was
recorded during the period.
9.1.2
Summary of Action and Limit Level exceedance of 1-hour TSP level
and 24-hour TSP level at AMS6 shall be referred to the monthly EM&A report
prepared by Contract No. HY/2011/03.
9.1.3
Construction noise monitoring were carried out in the reporting
month, no Action / Limit Level exceedance was recorded during the period.
9.1.4
Five environmental site inspections were carried out in the
reporting month. Recommendations on mitigation measures for air quality impact,
water quality impact and chemical and waste management were given to the Contractor for remediating the deficiencies identified
during the site inspections.
9.1.5
Two Bi-weekly Landscape and Visual Site audits were carried out by
a Registered Landscape Architect in the reporting month.
9.1.6
Referring to the Contractor¡¦s information, no environmental
complaint, notification of summons and successful prosecution was received in
the reporting month.
9.2.1
The recommended environmental mitigation measures, as proposed in
the EIA reports and EM&A Manuals shall be effectively implemented to
minimize the potential environmental impacts from the Project. The EM&A
programme would effectively monitor the environmental impacts generated from
the construction activities and ensure the proper implementation of mitigation
measures.
9.2.2
According to the environmental site inspections performed in the
reporting month, the following recommendations were provided:
Air Quality
Impact
¡P
Spent bags of cement should be
removed or covered.
Construction
Noise Impact
¡P
No specific observation was
identified in the reporting month.
Water Quality Impact
¡P
Stagnant water should be
cleared after raining.
¡P
Stockpile should be covered to
prevent surface runoff.
Chemical and
Waste Management
¡P
Temporary waste container
should be provided for good housekeeping.
Landscape
and Visual Impact
¡P
No specific observation was
identified in the reporting month.
Permit/
Licenses
¡P
No specific observation was identified