8.                    FUTURE KEY ISSUES

8.1                  Construction Programme for the Next Month

¡P            Excavation at VCP (land-based);

¡P            Road & Drain works at SPTI, NPTI and VCP (land-based);

¡P            Covered Walkway at SPTI and NPTI (land-based);

¡P            Public Toilet at NPTI (land-based);

¡P            Kiosks Construction at VCP (land-based);

¡P            Landscape Works at G1 and G5 (land-based);

¡P            Conceal Conduits Works at VCP (land-based);

¡P            E&M Works at SPTI (land-based);

¡P            Irrigation System at G1 and G5 (land-based).

8.2                  Key Issues for the Coming Month

8.2.1                                 Potential environmental impacts arising from the above construction activities are mainly associated with construction dust, construction noise, waste management and landscape and visual impact issues.

8.3                  Monitoring Schedules for the Next Month

8.3.1                                 The tentative schedule for environmental monitoring in the coming month is provided in Appendix E.