1.
2.
3.
4.
5.
SITE INSPECTION AND AUDIT
5.1.1
Site
audits were carried out by ET on weekly basis to monitor the implementation of
proper environmental management practices and mitigation measures in the
Project site.
5.1.2
In the reporting month, four site
inspections were carried out on 4, 12, 18 and 25 May 2022.
5.1.3
No outstanding issues were reported during the reporting month.
Details of observations recorded during the site inspections are summarized in Appendix G.
5.2.1
As informed by AECOM, the commencement date of the 12-month
establishment period for the landscape monitoring under this contract is 5
January 2022. Bi-monthly landscape and visual site audits will be conducted
from 5 January 2022 to 4 January 2023.
5.2.2
The next bi-monthly landscape and visual site audit was schedule
on 20 June 2022.
5.3.1
The Contractor registered as a chemical waste producer for the
Contract. Sufficient numbers of receptacles were available for general refuse
collection and sorting.
5.3.2
The monthly summary of waste flow table is detailed in Appendix D.
5.3.3
If off-site disposal is required, the excavated marine mud from
the land-based works shall be disposed of at the designated disposal sites
within Hong Kong as allocated by the Marine Fill Committee or other locations
as agreed by the Director. The Contractor shall ensure no spilling and
overflowing of materials during loading / unloading / transportation is
allowed.
5.3.4
The Contractor was reminded that chemical waste containers should
be properly treated and stored temporarily in designated chemical waste storage
area on site in accordance with the Code of Practice on the Packing, Labelling
and Storage of Chemical Waste.