1.1.1
Fugro
Technical Services Limited was commissioned by China Harbour Engineering Co.
Limited (also referred to as ¡§the Contractor¡¨) to undertake the Environmental
Team (ET) services (including environmental monitoring and audit (EM&A))
for Contract No. HY/2019/01 ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary
Crossing Facilities ¡V Phase 2 and Other Works¡¨.
1.1.2
Contract No. HY/2019/01
is part of the ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing
Facilities¡¨ (HZMB HKBCF) Project which is a ¡§Designated Project¡¨ under Schedule
2 of the Environmental Impact Assessment (EIA) Ordinance (Cap. 499) and for
which an EIA Report (Register No. AEIAR-145/2009) was prepared and approved.
The current Environmental Permit (EP) for HKBCF, namely No. EP-353/2009/K, was
issued on 11 April 2016. These documents are available through the EIA
Ordinance Register. The general layout of the Project area is shown in Figure 1. Commencement
of the Contract took place on 4 December 2019 and the construction site
preparation works commenced in early February 2020.
1.1.3
This is the 29th Monthly
EM&A report to document the findings of site inspection activities and
EM&A programme carried out by the Contractor of Contract No. HY/2019/01
from 1 June 2022 to 30 June 2022 (reporting period) and is submitted to fulfil
Condition 5.4 of the EP.
1.2.1
The works to be
executed under Contract No. HY/2019/01 include the following major items:
¡P
Landscaping and establishment works;
¡P
Irrigation system and associated drainage pumping system and facilities;
¡P
Erection and installation in the Passenger Clearance Building;
¡P
Public transport interchange (PTI) public toilet, satellite refuse
collection point (RCP) and observation guard booths;
¡P
PTI cross boundary shuttle (CBS) / cross boundary coach (CBC) lanes and
covered walkway;
¡P
Vehicle clearance plazas (VCP) vehicle kiosks and associate automatic
vehicle clearance supporting system (AVCSS).
1.3.1
The Project
Organization structure is shown in Appendix B.
The key personnel contact names and numbers are summarized in Table 1.1.
1.4
Construction Programme and Activities
1.4.1
The site layout plan of
the Contract is shown in Figure 1.
1.4.2
The construction
programme of this Contract is shown in Appendix A.
1.4.3
The Proposal for
Termination of EM&A Programme in Construction Phase (0002_20_ED_0467_04)
was verified by IEC on 13 June 2022 and submitted to EPD for approval.
1.5
Works undertaken during the month
1.5.1
No main construction
works was carried out in the reporting period.
1.6
Status of Environmental Licences, Notification and Permits
1.6.1
A summary of the
relevant permits, licenses and/or notifications on environmental protection for
this Contract is presented in Table 1.2.