1.1.1
Fugro Technical Services Limited was commissioned by
China Harbour Engineering Co. Limited (also referred to as ¡§the Contractor¡¨) to
undertake the Environmental Team (ET) services (including environmental
monitoring and audit (EM&A)) for Contract No. HY/2019/01 ¡§Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities ¡V Phase 2 and Other
Works¡¨.
1.1.2
Contract No. HY/2019/01 is part of the ¡§Hong Kong-Zhuhai-Macao Bridge Hong
Kong Boundary Crossing Facilities¡¨ (HZMB HKBCF) Project which is a ¡§Designated
Project¡¨ under Schedule 2 of the Environmental Impact Assessment (EIA)
Ordinance (Cap. 499) and for which an EIA Report (Register No. AEIAR-145/2009)
was prepared and approved. The current Environmental Permit (EP) for HKBCF,
namely No. EP-353/2009/K, was issued on 11 April 2016. These documents are
available through the EIA Ordinance Register. The general layout of the Project
area is shown in Figure 1.
Commencement of
the Contract took place on 4 December 2019 and the construction site
preparation works commenced in early February 2020.
1.1.3
This is the 30th Monthly EM&A report to document the findings of site
inspection activities and EM&A programme carried out by the Contractor of
Contract No. HY/2019/01 from 1 July 2022 to 31 July 2022 (reporting period) and
is submitted to fulfil Condition 5.4 of the EP.
1.2.1
The works to be executed under Contract No. HY/2019/01 include the
following major items:
¡P
Landscaping and establishment works;
¡P
Irrigation system and associated drainage pumping system and facilities;
¡P
Erection and installation in the Passenger Clearance Building;
¡P
Public transport interchange (PTI) public toilet, satellite refuse
collection point (RCP) and observation guard booths;
¡P
PTI cross boundary shuttle (CBS) / cross boundary coach (CBC) lanes and
covered walkway;
¡P
Vehicle clearance plazas (VCP) vehicle kiosks and associate automatic
vehicle clearance supporting system (AVCSS).
1.3.1
The Project Organization structure is shown in Appendix B. The key personnel contact names and numbers are
summarized in Table 1.1.
1.4
Construction Programme and Activities
1.4.1
The site layout plan of the Contract is shown in Figure 1.
1.4.2
The construction programme of this Contract is shown in Appendix A.
1.5
Works
undertaken during the month
1.5.1
No main construction works was carried out in the reporting period.
1.6
Status of
Environmental Licences, Notification and Permits
1.6.1
A summary of the relevant permits, licenses and/or notifications on
environmental protection for this Contract is presented in Table 1.2.