9.
CONCLUSION
AND RECOMMENDATION
9.1
Conclusions
9.1.1
According to the EPD¡¦s reply email, EPD has no comment on the Proposal for
Termination of Air quality and Noise Monitoring, the air quality and noise monitoring
for Contract No: HY/2019/01 have been terminated on 25 March 2022, no Action /
Limit Level exceedance for air quality and noise monitoring was recorded during
the period.
9.1.2
According to the EPD¡¦s letter (EPD ref. () in AX(12) in EP771/E1/100), EPD
has no comment on the Proposal for Termination of EM&A Programme in
Construction Phase, the site inspection for Contract No: HY/2019/01 have been
terminated on 5 July 2022.
9.1.3
Referring to the Contractor¡¦s information, no environmental complaint,
notification of summons and successful prosecution was received in the
reporting month.
9.2
Comment and Recommendations
9.2.1
The recommended environmental mitigation measures, as proposed in the EIA
reports and EM&A Manuals shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
9.2.2
According to the environmental site inspections performed in the reporting
month, the following recommendations were provided:
Air Quality Impact
¡P
No
specific observation was identified in the reporting month.
Construction Noise Impact
¡P
No
specific observation was identified in the reporting month.
Water Quality Impact
¡P
No
specific observation was identified in the reporting month.
Chemical
and Waste Management
¡P
No
specific observation was identified in the reporting month.
Permit/ Licenses
¡P
No specific observation was identified in the reporting month.