CONCLUSION
AND RECOMMENDATION
9.1.1
According
to the EPD¡¦s reply email, EPD has no comment on the Proposal for Termination of
Air quality and Noise Monitoring, the air quality and noise monitoring for
Contract No: HY/2019/01 have been terminated on 25 March 2022, no Action /
Limit Level exceedance for air quality and noise monitoring was recorded during
the period.
9.1.2
According
to the EPD¡¦s letter (EPD ref. () in AX(12) in EP771/E1/100), EPD has no comment on
the Proposal for Termination of EM&A Programme in Construction Phase, the site
inspection for Contract No: HY/2019/01 have been terminated on 5 July 2022.
9.1.3
Referring to the Contractor¡¦s information, no environmental complaint,
notification of summons and successful prosecution was received in the
reporting month.
9.2.1
The recommended environmental mitigation measures, as proposed in
the EIA reports and EM&A Manuals shall be effectively implemented to
minimize the potential environmental impacts from the Project. The EM&A
programme would effectively monitor the environmental impacts generated from
the construction activities and ensure the proper implementation of mitigation
measures.
9.2.2
According to the environmental site inspections performed in the
reporting month, the following recommendations were provided:
Air Quality Impact
¡P
No specific observation was
identified in the reporting month.
Construction Noise Impact
¡P
No specific observation was
identified in the reporting month.
Water Quality Impact
¡P
No specific observation was
identified in the reporting month.
Chemical and Waste Management
¡P
No specific observation was
identified in the reporting month.
Permit/ Licenses
¡P
No specific observation was identified
in the reporting month.