IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE
7.1.1
According to the EPD’s
letter (EPD ref. () in AX(12) in EP771/E1/100), EPD has no comment on the
Proposal for Termination of EM&A Programme in Construction Phase, the EM&A
programme for Contract No: HY/2019/01 have been terminated on 5 July 2022. The
implementation status of the environmental mitigation measures during the
reporting period is summarized in Appendix C.