1.
2.
3.
4.
5.
6.
9.1.1
According
to the EPD¡¦s reply email, EPD has no comment on the Proposal for Termination of
Air quality and Noise Monitoring, the air quality and noise monitoring for
Contract No: HY/2019/01 have been terminated on 25 March 2022, no Action /
Limit Level exceedance for air quality and noise monitoring was recorded during
the period.
9.1.2
According
to the EPD¡¦s letter (EPD ref. () in AX(12) in EP771/E1/100), EPD has no comment
on the Proposal for Termination of EM&A Programme in Construction Phase,
the site inspection for Contract No: HY/2019/01 have been terminated on 5 July
2022.
9.1.3
Referring
to the Contractor¡¦s information, no environmental complaint, notification of
summons and successful prosecution was received in the reporting month.
9.2.1
The
recommended environmental mitigation measures, as proposed in the EIA reports
and EM&A Manuals shall be effectively implemented to minimize the potential
environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
9.2.2
According
to the environmental site inspections performed in the reporting month, the
following recommendations were provided:
Air Quality Impact
¡P
No
specific observation was identified in the reporting month.
Construction Noise Impact
¡P
No
specific observation was identified in the reporting month.
Water Quality Impact
¡P
No
specific observation was identified in the reporting month.
Chemical
and Waste Management
¡P
No
specific observation was identified in the reporting month.
Permit/ Licenses
¡P
No
specific observation was identified in the reporting month.