CONCLUSION AND RECOMMENDATION
5.1.1
1-hour TSP and 24-hour
TSP impact monitoring at AMS2, AMS3C and AMS7B were carried out in the
reporting period, no Action / Limit Level exceedance was recorded during the
period.
5.1.2
Summary of Action
and Limit Level exceedance of 1-hour TSP level and 24-hour TSP level at AMS6
shall be referred to the monthly EM&A report prepared by Contract No.
HY/2011/03.
5.1.3
Construction
noise monitoring were carried out in the reporting period, no Action / Limit
Level exceedance was recorded during the period.
5.1.4
In accordance with the Dolphin Monitoring
Survey Findings and Analysis in Section 3.3.9 and 3.3.10 of Appendix I, low dolphin occurrence of
dolphins within the survey areas in both NEL and NWL were observed during the
construction period. Moreover, such significantly and dramatically decrease of
dolphin usage in those area has also been observed in this reporting quarter.
In addition, the dolphin usage in North Lantau water has not only shown no sign
of recovery, but also has continued to decline to the lowest ever level.
However, it is critical to continuously monitor the dolphin usage in North
Lantau region, in order to determine whether there is any sign of recovery
under the post-construction activities of the HKBCF next quarter.
5.1.5
17 weekly environmental
site inspections were carried out in the reporting period. Recommendations on
mitigation measures for air quality impact, water quality impact and chemical
and waste management were given to the Contractor for remediating the
deficiencies identified during the site inspections.
5.1.6
Referring to the
Contractor¡¦s information, no environmental complaint, notification of summons
and successful prosecution was received in the reporting period.
5.2.1
The recommended
environmental mitigation measures, as proposed in the EIA reports and EM&A
Manuals shall be effectively implemented to minimize the potential
environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
5.2.2
According to the
environmental site inspections performed in the reporting period, the following
recommendations were provided:
Air
Quality Impact
¡P
Dust
suppression measure should be provided.
¡P
Water
spray should be provided at all main exit to prevent sludge from being taken
outside the site area.
¡P
The
contractor was reminded to maintain housekeeping to prevent dust leaving from
the site.
Construction
Noise Impact
¡P
No
specific observation was identified in the reporting period.
Water
Quality Impact
¡P
Stagnant
water should be avoided and removed.
¡P
Silt
insider the U-channel should be cleared.
¡P
The
contractor was reminded surface water should be controlled properly to prevent
flowing outside.
Chemical
and Waste Management
¡P
All
waste generated at the site should be cleaned and collected.
¡P
The
opening of drip tray should be plugged to prevent chemical leakage.
¡P
Drip
tray should be provided for chemical container.
¡P
The
contractor was reminded to maintain housekeeping.
Landscape and Visual Impact
¡P
No
specific observation was identified in the reporting period.
Permit/
Licenses
¡P
NRMM
label should be provided to replace the substandard label.
Others
¡P
The
caps for the water-safety barriers should be provided.
¡P[This is the bookmark for the end of the