1.
2.
3.
4.
5.
CONCLUSION AND RECOMMENDATION
5.1.1
1-hour
TSP and 24-hour TSP impact monitoring at AMS2, AMS3C and AMS7B were carried out
in the reporting period, no Action / Limit Level exceedance was recorded during
the period.
5.1.2
Summary
of Action and Limit Level exceedance of 1-hour TSP level and 24-hour TSP level
at AMS6 shall be referred to the monthly EM&A report prepared by Contract
No. HY/2011/03.
5.1.3
Construction
noise monitoring were carried out in the reporting period, no Action / Limit
Level exceedance was recorded during the period.
5.1.4
In
accordance with the Dolphin Monitoring Survey Findings and Analysis in Section
3.3.9 and 3.3.10 of Appendix I, low dolphin occurrence of
dolphins within the survey areas in both NEL and NWL were observed during the
monitoring period. Moreover, such significantly and dramatically decrease of
dolphin usage in those area has also been observed in this reporting quarter.
In addition, the dolphin usage in North Lantau water has not only shown no sign
of recovery, but also has continued to decline to the lowest ever level.
However, it is critical to continuously monitor the dolphin usage in North
Lantau region, in order to determine whether there is any sign of recovery
under the post-construction activities of the HKBCF next quarter.
5.1.5
13
weekly environmental site inspections were carried out in the reporting period.
Recommendations on mitigation measures for air quality impact, water quality
impact and chemical and waste management were given to the Contractor for
remediating the deficiencies identified during the site inspections.
5.1.6
4
Bi-weekly Landscape and Visual Site audits were carried out by a Registered
Landscape Architect in the reporting period.
5.1.7
Referring
to the Contractor¡¦s information, no environmental complaint, notification of
summons and successful prosecution was received in the reporting period.
5.2.1
The
recommended environmental mitigation measures, as proposed in the EIA reports
and EM&A Manuals shall be effectively implemented to minimize the potential
environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
5.2.2
According
to the environmental site inspections performed in the reporting period, the
following recommendations were provided:
Air
Quality Impact
¡P
The
contractor was reminded dust suppression should be provided during breaking.
Construction
Noise Impact
¡P
No
specific observation was identified in the reporting period.
Water
Quality Impact
¡P
The
contractor was reminded the stagnant water should be removed.
¡P
The
contractor was reminded to fix the leakage of internal pipe connection of Wetsep.
Chemical
and Waste Management
¡P
The
contractor was reminded to maintain housekeeping.
¡P
The
contractor was reminded the stain should be cleaned up immediately.
Landscape and Visual Impact
¡P
No
specific observation was identified in the reporting period.
Permit/
Licenses
¡P
No
specific observation was identified in the reporting period.
Others
¡P
No
specific observation was identified in the reporting period.