2.                    Project Description

2.1                    Project Description

Hong Kong Link Road

2.1.1       Not applicable.

Hong Kong Boundary Crossing Facilities

2.1.2       Not applicable.

2.1.3A     The Proposed works under this Contract comprise the following:

n   Landscaping and establishment works;

n   Irrigation system and associated drainage pumping system and facilities;

n   Erection and installation in the Passenger Clearance Building;

n   Public transport interchange (PTI) public toilet, satellite refuse collection point (RCP) and observation guard booths;

n   PTI cross boundary shuttle (CBS) / cross boundary coach (CBC) lanes and covered walkway;

n   Vehicle clearance plazas (VCP) vehicle kiosks and associate automatic vehicle clearance supporting system (AVCSS).

2.2                   Implementation Programme

2.2.1A  The construction phase for the Contract commenced in the early 2020 and tentatively be completed by the end of 2021.

2.2.2     Appendix A illustrates the tentative construction programme for the Contract. All the key construction activities are shown with the tentative dates for commencement and completion.

2.2.3   Detailed EIA assessments have been conducted and presented in the EIA report. All necessary mitigation measures have been identified and recommended. The Environmental MitigationImplementation Schedule (EMIS) is given in Appendix B. It specifies the extent, locations, time frame and responsibilities for the implementation of the environmental mitigation measures identified.

2.3                   Concurrent Project During Construction Phase

2.3.1A  The Hong Kong Link Road was opened to the public in October 2018 in matching the Phase 1 commissioning date of HKBCF.

2.3.2A  The Main Bridge of the HZMB within the Guangdong water would also be concurrent with the construction of HKLR and HKBCF Phase 1. The Main Bridge of the HZMB was commissioned in October 2018.

2.3.3A  Other major projects under planning and/or construction are likely to interface with the Contract, which are:

n   Expansion of Hong Kong International Airport into a Three-Runway System;

n   Tung Chung New Town Extension; and

n   Intermodal Transfer Terminal - Bonded Vehicular Bridge and Associated Roads.

2.3.4A     The advance works of the Tuen Mun ¡V Chek Lap Kok Link (TMCLKL) such as reclamation works of the southern landfill of the TMCLKL sub-sea tunnel commenced in late 2011. The southern connection of the TMCLKL is scheduled to be completed in 2020 and the northern connection is scheduled to be completed in 2021.  The construction of Hong Kong Link Road (HKLR) commenced in 2012 and is scheduled to be completed in 2020.