Table 14.4 Action Plan for Landscape and Visual Works

 

EVENT

ACTION

ET

IEC

ER

CONTRACTOR

Conflicts occur

Check Contractor¡¦s proposed remedial design conforms to the requirements of EP and prepare checking report(s)

Check and endorse ET¡¦s report(s)

Check and certify Contractor¡¦s proposed remedial design

Supervise the Contractor to carry out the proposed remediation work

Propose remedial design and carry out the proposed work