Table 8.6d     Comparison of Baseline, Impact and Post-construction Water Quality Monitoring Results (Suspended Solids, Mid Ebb Tide)

Station(s)

Baseline (October to November 2011)

Impact (Feb 2013 to Oct 2018)

Post-construction  (Oct to Nov 2018)

Suspended Solids (mg/L), depth average

Min

Max

Min

Max

Min

Max

CS1

7.4

24.2

1.4

54.2

5.5

16.3

CS2

7.0

18.3

1.5

65.5

6.0

13.1

IS1

6.3

19.5

0.8

89.5

6.5

11.8

IS2

5.3

20.1

1.1

66.9

5.8

11.1

IS3

10.0

28.3

1.4

51.5

6.1

13.2

IS4

9.3

24.3

1.2

58.7

6.0

21.5

SR1

6.5

39.5

1.1

45.6

3.0

17.1

SR2

7.0

53.0

0.6

85.4

5.7

16.1

SR3

6.7

31.0

1.4

48.8

5.6

14.3

SR6

7.4

18.3

1.5

83.5

4.1

14.4

SRA

3.5

17.3

1.2

50.4

6.6

13.3

ST1

7.0

25.5

1.3

166.8

5.5

13.1

ST2

4.3

16.8

1.0

137.2

5.5

17.6

ST3

6.0

31.0

1.2

56

5.5

16.3