6              ENVIRONMENTAL site inspection

Site Audits

6.1         Site audit provided a direct means to trigger and enforce the specified environmental protection and pollution control measures. The ET undertook site audits routinely to ensure that appropriate environmental protection and pollution mitigation measures are properly implemented. Additionally, the ET was responsible for defining the scope of the inspections, detailing any deficiencies that are identified, and reporting any necessary action or mitigation measures that were implemented as a result of the audit.

6.2         Site audits were carried out by ET on weekly basis in construction phase to monitor the timely implementation of proper environmental management practices and mitigation measures in the Contract site. The area of inspection included the general environmental conditions in the vicinity of site, pollution control and mitigation measure within the site, and also review the environmental conditions outside the site area which are likely to be affected, directly or indirectly, by the site activities.

6.3         The implementation of the environmental mitigation measures and environmental complaint handling procedures were also checked.

6.4         According to EP condition 4.7 and EM&A Manual, periodic monitoring (every three months) of construction works shall be conducted to ensure the avoidance of any impacts on Sha Lo Wan (West) Archaeological Site. Access to Sha Lo Wan (West) Archaeological site for works areas and storage of construction equipment is not allowed. No access to Sha Lo Wan (West) Archaeological site for works areas and storage of construction equipment was observed. The detailed results and observations were recorded in the monthly EM&A report.

Implementation Status of Environmental Mitigation Measures

 

6.5         The mitigation measures detailed in the Environmental Permit, the Manual and in the EIA report were implemented throughout the whole contract period. A summary of the EMIS is provided in Appendix C.

6.6         Regular marine travel route for marine vessels were implemented properly in accordance with the submitted plan and relevant records were kept properly.

6.7         Acoustic decoupling measures for the stationary equipment (generators, winch generators and air compressors) mounted on boards were adopted according to EP Condition 3.7 and EM&A Manual, Section 10.2.18.

6.8         Dolphin exclusion zone and dolphin watching plan according to EM&A Manual, Section 10.2.12 and EP Condition 3.5 was implemented by DCVJV’s trained dolphin watcher.

6.9         Spill kits and booms are ready on site for the event of accidental spillage of oil or other hazardous chemicals from construction activities including vessels operating for the Contract.

6.10     No non-compliance was recorded during the site inspection throughout the construction period. Observations and recommendations recorded during the site inspections were summarized in each of the Monthly EM&A Reports.

Solid and Liquid Waste Management Status

6.11     The Contractor was advised to minimize the wastes generated through the recycling or reusing. All mitigation measures stipulated in approved waste management plan were fully implemented.

6.12     The amount of wastes generated by the activities of the Contract was shown in the Monthly EM&A Reports.