Appendix G - Noise Monitoring Results
Location NMS 1 - Sha Tau Wan
Date Weather Time Unit: dB (A) (5-min) Average Baseline Level Construction Noise Level
L eq L10 L 90 L eq L eq L eq
23-Feb-13 Sunny 14:30 67.8 78.2 45.5 65 66.9 65 Measured ¡Ø Limit Level
14:35 65.0 76.6 41.9
14:40 67.2 79.8 47.3
14:45 48.1 55.2 42.8
14:50 44.5 48.0 43.0
14:55 64.2 73.9 44.8
Location NMS 4 - San Tau
Date Weather Time Unit: dB (A) (5-min) Average Baseline Level Construction Noise Level
L eq L10 L 90 L eq L eq L eq
23-Feb-13 Sunny 15:10 62.5 65.3 45.4 59 56.0 59 Measured ¡Ø Limit Level
15:15 53.2 56.2 43.7
15:20 54.0 57.3 45.1
15:25 53.8 57.1 46.0
15:30 58.4 61.1 47.8
15:35 61.6 65.8 46.0