Table 7.1           Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

N/A(1)

N/A(1)

N/A(1)

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

12/03/2013

Provide water spray for the exposed area and stockpiles of dusty materials at Portion C.

Rectification/improvement was observed during the follow-up audit session on 19 March 2013.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

05/03/2013

To clear the oil leakage from the generator at P15. (This deficiency has already rectified by the Contractor during the site inspection)

This deficiency has already rectified by the Contractor during the site inspection.

12/03/2013

To clear the deposited sediment at the drip tray at Portion C.

Rectification/improvement was observed during the follow-up audit session on 19 March 2013.

19/03/2013

Clear the oil stain leaked to paved ground at Portion WA4.

Rectification/improvement was observed during the follow-up audit session on 26 March 2013.

Landscape & Visual Impact

26/03/2013

To install fencing for tree protection area at Portion C.

Rectification/improvement was observed during the follow-up audit session on 2 April 2013.

Other(s)

26/03/2013

To display the Environmental Permit at the site entrance of Portion C.

Rectification/improvement was observed during the follow-up audit session on 2 April 2013.

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

25/03/2013

N/A(1)

N/A(1)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.