Table
7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
N/A(1) |
N/A(1) |
N/A(1) |
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air Quality |
12/03/2013 |
Provide water spray for the exposed area and stockpiles of dusty
materials at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 19 March 2013. |
Noise |
N/A(1) |
N/A(1) |
N/A(1) |
Waste /
Chemical Management |
05/03/2013 |
To clear the oil leakage from the generator at P15. (This deficiency
has already rectified by the Contractor during the site inspection) |
This
deficiency has already rectified by the Contractor during the site
inspection. |
12/03/2013 |
To clear the deposited sediment at the drip tray at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 19 March 2013. |
|
19/03/2013 |
Clear the oil stain leaked to paved ground at Portion WA4. |
Rectification/improvement
was observed during the follow-up audit session on 26 March 2013. |
|
Landscape
& Visual Impact |
26/03/2013 |
To install fencing for tree protection area at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 2 April 2013. |
Other(s) |
26/03/2013 |
To display the Environmental Permit at the site entrance of Portion
C. |
Rectification/improvement
was observed during the follow-up audit session on 2 April 2013. |
Cultural Heritage (Sha Lo Wan (West)
Archaeological Site) |
25/03/2013 |
N/A(1) |
N/A(1) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.