Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr TSP
Monitoring |
6th, 12th, 18th,
22nd and 27th March 2013 |
24-hr TSP
Monitoring |
6th, 12th, 18th,
22nd and 27th March 2013 |
Noise Monitoring |
1st, 7th, 13th,
19th, 23rd and 28th March 2013 |
Water Quality
Monitoring |
1st, 4th, 6th,
8th, 11th, 13th, 15th, 18th,
20th, 23rd, 25th, 27th and 29th
March 2013 |
8th and 22th March
2013 |
|
*Construction-phase
underwater Noise Monitoring |
With Bored Piling Activities: 18th, 19th, 20th,
21st, 22nd, 23rd, 25th, 27th,
28th March 2013 Without Bored Piling Activities: 13th, 14th, 15th
and 26th March 2013 |
*Dolphin Behaviour Monitoring |
With Bored Piling Activities: 18th, 19th, 20th,
21st, 22nd, 23rd, 25th, 27th,
28th and 29th March 2013 Without Bored Piling Activities: 6th, 7th, 8th,
9th, 11th to 17th, 24th and 30th
March 2013 |
*Land-based
Dolphin Behaviour and Movement Monitoring |
With Bored Piling Activities: 18th, 19th, 20th,
21st, 22nd, 23rd, 25th, 27th,
28th March 2013 Without Bored Piling Activities: 6th, 7th, 9th
to 17th, 24th and 30th March 2013 |
Environmental Site
Inspection |
5th, 12th, 19th
and 26th March 2013 |
Archaeological
Site Inspection |
25th March 2013 |
Remark: *Dolphin-related monitoring was conducted
in the reporting month. According to the EM&A Manual for HKLR, the dolphin-related
monitoring was conducted during the bored piling activities (e.g. installation
of permanent casting for bored piling activities) which presented in Appendix A. The dolphin-related monitoring conducted
without bored piling activities are for reference only.