Table I            Summary Table for Monitoring Activities in the Reporting Month

Parameter(s)

Date(s)

1-hr TSP Monitoring

6th, 12th, 18th, 22nd and 27th March 2013

24-hr TSP Monitoring

6th, 12th, 18th, 22nd and 27th March 2013

Noise Monitoring

1st, 7th, 13th, 19th, 23rd and 28th March 2013

Water Quality Monitoring

1st, 4th, 6th, 8th, 11th, 13th, 15th, 18th, 20th, 23rd, 25th, 27th and 29th March 2013

Dolphin Monitoring (Line-transect Vessel Surveys)

8th and 22th March 2013

*Construction-phase underwater Noise Monitoring

With Bored Piling Activities:

18th, 19th, 20th, 21st, 22nd, 23rd, 25th, 27th, 28th March 2013

Without Bored Piling Activities:

13th, 14th, 15th and 26th March 2013

*Dolphin Behaviour Monitoring

With Bored Piling Activities:

18th, 19th, 20th, 21st, 22nd, 23rd, 25th, 27th, 28th and 29th March 2013

Without Bored Piling Activities:

6th, 7th, 8th, 9th, 11th to 17th, 24th and 30th March 2013

*Land-based Dolphin Behaviour and Movement Monitoring

With Bored Piling Activities:

18th, 19th, 20th, 21st, 22nd, 23rd, 25th, 27th, 28th March 2013

Without Bored Piling Activities:

6th, 7th, 9th to 17th, 24th and 30th March 2013

Environmental Site Inspection

5th, 12th, 19th and 26th March 2013

Archaeological Site Inspection

25th March 2013

Remark: *Dolphin-related monitoring was conducted in the reporting month. According to the EM&A Manual for HKLR, the dolphin-related monitoring was conducted during the bored piling activities (e.g. installation of permanent casting for bored piling activities) which presented in Appendix A.  The dolphin-related monitoring conducted without bored piling activities are for reference only.