9               FUTURE KEY ISSUEs

Key Issues in the Coming Month

9.1         Major site activities for the coming reporting month will include:

WA4

Ÿ   Preparation for bored piling

Ÿ   Fabrication of temporary piling platforms and rebar cages

Ÿ   Loading and unloading

Ÿ   Setup of casting yard

WA7

Ÿ   Preparation for bored piling

Ÿ   Fabrication of temporary piling platforms and rebar cages

Ÿ   Loading and Unloading

Portion A

Ÿ   Site clearance and formation

Ÿ   Timber Scaffolding

Ÿ   Ground Investigation

Ÿ   Set-up facilities for marine delivery of concrete from land plants

Portion C

Ÿ   Trial Pit excavation for U/U

Ÿ   Ground Investigation

Ÿ   Erection of hoarding & fencing

Ÿ   Site office area set up

Ÿ   Pre-drilling work at western water, along slopping seawall

Ÿ   Protection work to the fuel pipes along the access road

Ÿ   Slewing work for CLP 11kVA and 132kVA power cable

Western Water

Ÿ   Ground Investigation for design

Ÿ   Pre-drilling Work

Ÿ   Loading and Unloading

Ÿ   Preparation work for bored piling

Ÿ   Setting up of silt-curtain

Ÿ   Bored piling excavation and concreting works

 

Monitoring Schedule for the Next Month

9.2         The tentative environmental monitoring schedule for the next month is shown in Appendix D.

Construction Programme for the Next Month

9.3         A tentative construction programme is provided in Appendix A.