Table 7.1        Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

N/A(1)

N/A(1)

N/A(1)

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

16/04/2013

Properly cover the stockpile of dusty material at Portion C.

Rectification/improvement was observed during the follow-up audit session on 26 April 2013.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

02/04/2013

Clear the oil leakage from the drip tray for the air compressor and provide the plug for the drip tray to avoid further leakage at WA4.

Follow-up action was needed for the item.

09/04/2013

Clear the oil spillage at WA4 properly.

Follow-up action was needed for the item.

09/04/2013

Provide the plug for the drip tray for generator at WA4.

Rectification/improvement was observed during the follow-up audit session on 16 April 2013.

16/04/2013

Empty chemical containers should be stored in temporary chemical waste storage area at WA4.

Rectification/improvement was observed during the follow-up audit session on 26 April 2013.

16/04/2013

Clear the oil spillage from the drip tray at WA4.

Follow-up action was needed for the item.

30/04/2013

To seal the hole of the drip tray for the generator at Portion C.

Rectification/improvement was observed during the follow-up audit session on 7 May 2013.

30/04/2013

Clear the oil spillage at near the generator and workshop for steel bar at WA4.

Rectification/improvement was observed during the follow-up audit session on 7 May 2013.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Other(s)

26/04/2013

The boom for oil spillage was observed not ready on site (Pier 48). According to DCVJV, such boom has already ordered. The Contractor was reminded to arrange it on site urgently.

Rectification/improvement was observed during the follow-up audit session on 30 April 2013.

26/04/2013

Properly implement the acoustic decoupling measures according to the approved plan (e.g. isolation pad)

Rectification/improvement was observed during the follow-up audit session on 30 April 2013.

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.