Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr TSP Monitoring |
2nd, 8th,
12th, 18th, 24th and 30th April
2013 |
24-hr TSP Monitoring |
2nd, 8th,
12th, 18th, 24th and 30th April
2013 |
Noise Monitoring |
3rd, 9th,
15th and 25th April 2013 |
Water Quality Monitoring |
1st, 3rd,
5th, 8th, 10th, 12th, 15th,
17th, 19th, 22th, 24th, 26th
and 29th April 2013 |
9th and
17th April 2013 |
|
(1)Construction-phase
underwater Noise Monitoring |
With Bored Piling
Activities: 2nd, 3rd,
5th, 8th, 9th, 10th, 25th,
26th, 27th, 29th and 30th April 2013 Without Bored
Piling Activities: 11th
April 2013 |
(1)Dolphin Behaviour Monitoring |
With Bored Piling
Activities: 1st, 2nd,
3rd, 5th, 7th, 8th, 10th
and 11th April 2013 |
(1)Land-based Dolphin Behaviour and Movement Monitoring |
With Bored Piling
Activities: 1st, 2nd,
4th, 5th, 7th, 8th, 9th,
10th and 11th April 2013 |
Environmental Site Inspection |
2nd, 9th,
16th, 26th and 30th April 2013 |
Archaeological Site Inspection |
(2)N/A |
Remark: (1)Dolphin-related monitoring was conducted in the reporting month. According to
the EM&A Manual for HKLR, the dolphin-related monitoring was conducted
during the bored piling activities (e.g. installation of permanent casting for
bored piling activities) which presented in Appendix A. The
dolphin-related monitoring conducted without bored piling activities are for
reference only.
(2) No archaeological site inspection was
conducted in the reporting month.