Table
7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
14/05/2013 |
Remove the water tube
which is directly connected to the public drain at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 21 May 2013. |
21/05/2013 |
Leakage of water from the GI Platform was observed at P11. The
Contractor was reminded to check and rectify the bund of the platform to
avoid further leakage. |
Rectification/improvement
was observed during the follow-up audit session on 31 May 2013. |
|
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air Quality |
31/05/2013 |
Provide water spray for the dry exposed area at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 4 June 2013. |
Noise |
07/05/2013 |
Close the door when
operation of compressor at P52. |
Rectification/improvement
was observed during the follow-up audit session on 14 May 2013. |
Waste /
Chemical Management |
07/05/2013 |
Clear the oil leakage at
near the drip tray at P52. |
Rectification/improvement
was observed during the follow-up audit session on 14 May 2013. |
14/05/2013 |
Clear the accumulated waste materials at the
material skip at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 21 May 2013. |
|
21/05/2013 |
Provide the drip tray for the chemical containers at P0. |
Rectification/improvement
was observed during the follow-up audit session on 31 May 2013. |
|
21/05/2013 |
Replace the damage sand bags at P48. |
Rectification/improvement
was observed during the follow-up audit session on 31 May 2013. |
|
21/05/2013 |
Provide the plug for the drip tray for power pack
at P72. |
Rectification/improvement
was observed during the follow-up audit session on 31 May 2013. |
|
31/05/2013 |
Regular clear the waste materials at material
skip at WA4 and cover the material skip properly. |
Rectification/improvement
was observed during the follow-up audit session on 4 June 2013. |
|
31/05/2013 |
Clear the leaked soda powder at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 4 June 2013. |
|
Landscape
& Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Other(s) |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan (West)
Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1) - No
major environmental deficiency was identified during the site inspection in the
reporting month.
N/A(2) No
archaeological site inspection was conducted in the reporting month.