Table 7.1           Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

14/05/2013

Remove the water tube which is directly connected to the public drain at Portion C.

Rectification/improvement was observed during the follow-up audit session on 21 May 2013.

21/05/2013

Leakage of water from the GI Platform was observed at P11. The Contractor was reminded to check and rectify the bund of the platform to avoid further leakage.

Rectification/improvement was observed during the follow-up audit session on 31 May 2013.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

31/05/2013

Provide water spray for the dry exposed area at Portion C.

Rectification/improvement was observed during the follow-up audit session on 4 June 2013.

Noise

07/05/2013

Close the door when operation of compressor at P52.

Rectification/improvement was observed during the follow-up audit session on 14 May 2013.

Waste / Chemical Management

07/05/2013

Clear the oil leakage at near the drip tray at P52.

Rectification/improvement was observed during the follow-up audit session on 14 May 2013.

14/05/2013

Clear the accumulated waste materials at the material skip at WA4.

Rectification/improvement was observed during the follow-up audit session on 21 May 2013.

21/05/2013

Provide the drip tray for the chemical containers at P0.

Rectification/improvement was observed during the follow-up audit session on 31 May 2013.

21/05/2013

Replace the damage sand bags at P48.

Rectification/improvement was observed during the follow-up audit session on 31 May 2013.

21/05/2013

Provide the plug for the drip tray for power pack at P72.

Rectification/improvement was observed during the follow-up audit session on 31 May 2013.

31/05/2013

Regular clear the waste materials at material skip at WA4 and cover the material skip properly.

Rectification/improvement was observed during the follow-up audit session on 4 June 2013.

31/05/2013

Clear the leaked soda powder at WA4.

Rectification/improvement was observed during the follow-up audit session on 4 June 2013.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Other(s)

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

   Remark:    N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.