9.1
Major
site activities for the coming reporting month will include:
WA4
Fabrication
of rebar cages
Loading and
unloading
Setup of
casting yard
WA7
Preparation
for bored piling
Fabrication
of rebar cages
Loading and
Unloading
Portion A (Land Section)
Site clearance
and formation
Timber
Scaffolding
Pre-drilling
work
Set-up
facilities for marine delivery of concrete from land plants
Slewing of the
tele©\communication & AA COM cables
Portion C
Satellite
site office set up
Pre-drilling
work
Protection
work to the fuel pipes
Fabrication
of reinforcement cage and piling jacket, setting up
for land piling work
Western
Water
Pre-drilling
Work
Loading and
Unloading
Setting up
of silt-curtain
Platform
installation for pre©\drilling works
Installation
of temporary casings for the piling platform
Installation
of permanent casing
Bored piling
works
9.2
The
tentative environmental monitoring schedule for the next month is shown in Appendix D.
9.3
A tentative
construction programme is provided in Appendix A.