9.1
Major
site activities for the coming reporting month will include:
WA4
Fabrication
of rebar cages
Loading and
unloading
Setup of
casting yard
WA7
Fabrication
of rebar cages
Loading and
Unloading
Portion A (Land Section)
Site
clearance and erection of water
filled barriers as boundary
Timber Scaffolding
Pre-drilling
work
Set-up
facilities for marine delivery of concrete from land plants
Portion C
Land piling
Slewing the tele-communication cable and AA¡¯s COM cable
Tree
felling/transplant
Drainage and
water main diversion
Western
Water
Pre-drilling
Work
Setting
up of silt-curtain
Platform
installation for pre©\drilling works and bored piling works
Installation
of temporary casings for the piling platform
Installation
of permanent casing
Bored
piling works
9.2
The
tentative environmental monitoring schedule for the next month is shown in Appendix D.
9.3
A
tentative construction programme is provided in Appendix A.