Table 7.1           Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

02/07/2013

To review the sedimentation process of the surface runoff at Portion C.

Rectification/improvement was observed during the follow-up audit session on 9 July 2013.

09/07/2013

To clear the water at wheel washing bay at Portion C.

Rectification/improvement was observed during the follow-up audit session on 16 July 2013.

09/07/2013

To clear the sand and silt settled at the drain at Portion C.

Rectification/improvement was observed during the follow-up audit session on 16 July 2013.

16/07/2013

To clear the sediment at the deck of flap-top work barge at P50.

Rectification/improvement was observed during the follow-up audit session on 23 July 2013.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

16/07/2013

To check the air compressor at P50 to avoid emitting grey smoke.

Rectification/improvement was observed during the follow-up audit session on 23 July 2013.

Noise

16/07/2013

To close the door of air compressor which is in operation at P50.

Rectification/improvement was observed during the follow-up audit session on 23 July 2013.

Waste / Chemical Management

23/07/2013

To seal the hole of the drip tray near the office containers at Portion C.

Follow-up action was needed for the item.

23/07/2013

To remove the construction materials which were placed at near the tree at Portion C.

Follow-up action was needed for the item.

23/07/2013

Clear the deposit silt and sediment at the site exit and drainage channel at Portion C.

Rectification/improvement was observed during the follow-up audit session on 30 July 2013.

23/07/2013

Clear the oil stain at near the Pontoon at WA4.

Rectification/improvement was observed during the follow-up audit session on 30 July 2013.

30/07/2013

To remove the construction materials which were placed at near the tree at Portion C.

Follow-up action was needed for the item.

30/07/2013

Clear the deposit silt and sediment at the drainage channel at Portion C.

Follow-up action was needed for the item.

30/07/2013

To seal the hole of the drip tray near the office containers at Portion C.

Follow-up action was needed for the item.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Other(s)

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark:   N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.