9               FUTURE KEY ISSUEs

Key Issues in the Coming Month

 

9.1         Major site activities for the coming reporting month will include:

WA4

Ÿ   Fabrication of rebar cages

Ÿ   Fabrication of temporary piling platforms

 

WA7

Ÿ   Fabrication of rebar cages

Ÿ   Loading and Unloading

 

Land Viaduct (P85 to P114)

Ÿ   Set up of water treatment system

Ÿ   Set up of piling platforms

Ÿ   Set up of barriers

Ÿ   Site clearance

Ÿ   Forming of site access

Ÿ   Marine landing access establishment work

Ÿ   Land piling

Ÿ   Slewing  the  tele-communication cable and AA¡¯s COM cable

Ÿ   Tree felling/transplant

Ÿ   Drainage  and  water  main diversion

Ÿ   Pre-drilling work

 

Marine Viaduct (P0 to P84)

Ÿ   Piling works for temporary jetty

Ÿ   Installation of piling jacket

Ÿ   Installation of permanent casings

Ÿ   Installation of temporary casings

Ÿ   Pile excavation by RCD method

Ÿ   Pile excavation by Kelly method

Ÿ   Pre-drilling Work

Ÿ   Setting up of silt-curtain

Ÿ   Platform installation for pre-drilling works and bored piling works

 

Monitoring Schedule for the Next Month

9.2         The tentative environmental monitoring schedule for the next month is shown in Appendix D.

Construction Programme for the Next Month

 

9.3         A tentative construction programme is provided in Appendix A.