9.1
Major
site activities for the coming reporting month will include:
WA4
Fabrication
of rebar cages
Fabrication
of temporary piling platforms
WA7
Fabrication
of rebar cages
Loading and
Unloading
Land
Viaduct (P85 to P114)
Set up of
water treatment system
Set up of
piling platforms
Set up of
barriers
Site
clearance
Forming of
site access
Marine
landing access establishment work
Land piling
Slewing the
tele-communication cable and AA¡¯s COM cable
Tree felling/transplant
Drainage and
water main diversion
Pre-drilling
work
Marine Viaduct
(P0 to P84)
Piling
works for temporary jetty
Installation
of piling jacket
Installation
of permanent casings
Installation
of temporary casings
Pile
excavation by RCD method
Pile
excavation by Kelly method
Pre-drilling
Work
Setting up
of silt-curtain
Platform
installation for pre-drilling works and bored piling works
9.2
The
tentative environmental monitoring schedule for the next month is shown in Appendix D.
9.3
A tentative
construction programme is provided in Appendix A.