Table
7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
10/09/2013 |
Clear the residual silt and debris at the platform at P20. |
Rectification/improvement
was observed during the follow-up audit session on 17 September 2013. |
17/09/2013 |
Review the drainage plan at Portion C to avoid
accumulating ponding water. |
Rectification/improvement
was observed during the follow-up audit session on 27 September 2013. |
|
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air Quality |
10/09/2013 |
Properly check the air compressor to avoid heavy smoke at P47. |
Rectification/improvement
was observed during the follow-up audit session on 17 September 2013. |
27/09/2013 |
Exposed stockpile should be properly covered by tarpaulin to avoid
dust emission. (Portion C) |
Rectification/improvement
was observed during the follow-up audit session on 2 October 2013. |
|
Noise |
10/09/2013 |
Properly implement the acoustic decoupling measures for the water
pump at P0. |
Rectification/improvement
was observed during the follow-up audit session on 17 September 2013. |
17/09/2013 |
Provide the noise label for the air compressor at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 27 September 2013. |
|
Waste /
Chemical Management |
03/09/2013 |
Clear the oil spillage from the air compressor at
Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 10 September 2013. |
03/09/2013 |
Remove the pipe at the drainage channel at
Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 10 September 2013. |
|
03/09/2013 |
Remove the chemical container which placed at
near the drain at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 10 September 2013. |
|
17/09/2013 |
Clear the rubbish at the back of office
containers at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 27 September 2013. |
|
27/09/2013 |
General refuse should be properly disposed of and
separated from C&D waste materials. (Portion C) |
Rectification/improvement
was observed during the follow-up audit session on 2 October 2013. |
|
27/09/2013 |
Fencing and other construction materials should
be kept a distance from tree protection zone. (Portion C) |
Rectification/improvement
was observed during the follow-up audit session on 2 October 2013. |
|
Landscape
& Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Other(s) |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan (West)
Archaeological Site) |
10/09/2013 |
N/A(1) |
N/A(1) |
Remark: N/A(1) - No major environmental
deficiency was identified during the site inspection in the reporting month.