Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr TSP Monitoring |
4th, 10th,
16th, 21st and 27th September 2013 |
24-hr TSP Monitoring |
4th, 10th,
16th, 21st and 27th September 2013 |
Noise Monitoring |
5th, 11th
, 17th, 23rd and 30th September 2013 |
Water Quality Monitoring |
2nd, 4th,
6th, 9th, 11th, 14th, 16th,
18th, 21st, 23rd, 25th , 28th
and 30th September 2013 |
11th and 19th
September 2013 |
|
(1)Additional Land-based Dolphin Behaviour
and Movement Monitoring |
28th and 30th
September 2013 |
Environmental Site Inspection |
3rd, 10th,
17th and 27th September 2013 |
Archaeological Site Inspection |
10th September 2013 |
Remark:
(1) Additional Land-based Dolphin Behaviour and Movement Monitoring Results will be presented
in a separate report as the results analysis has not finished.
(2) Land-based Dolphin Behaviour and Movement
Monitoring will be conducted on 30 and 31 October 2013 according to the
original approved methodology paper. A revised proposal prepared by the
Dolphin Specialist, Dr. Samuel Hung was submitted on 2 October 2013. EPD
and AFCD subsequently provided advisory comments on this revised proposal on 7
October 2013. A finalized proposal for the Land-based Dolphin Behaviour and
Movement Monitoring will be submitted for approval in due course.